SCP-3113
Euclid
~
medium confidence
SCP-3113
Expected annual
$3.8M
One-time setup
$6.9M
Annual recurring
$3.6M
Personnel
17
Initial capital expenditure is approximately $6.9M driven by chamber construction, robotics/sensor systems, and contingency/insurance seed funds; recurring annual costs are ~ $3.61M driven by remote staff wages, ongoing research, and maintenance/contingency reserves.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal year with routine testing cadence, regular maintenance, and no major incidents.
standard_operations
scheduled_research
no_breach
🚨
Minor Incident
$4.1M/yr
Localized structural damage or equipment failure from an ejection event requiring repairs, extra amnestic administrations and limited legal/PR response.
routine_test_damage
sensor_or_robot_failure
🚨
Major Breach
$8.6M/yr
Significant containment breach or high-profile incident causing major structural damage, casualties, large settlements and extended downtime.
high_velocity_displacement
structural_collapse
public_exposure
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#10] Senior researchers conducting experiment design and oversight (remote-only). |
| Remote Operator / Robotics Technician | 3 | [#5, #10] Teleoperated crane/robot operators and technicians for remote handling and setup (remote-only). |
| Data Analyst | 2 | [#4, #10] Remote data/video/forensic analysts processing sensor outputs (remote-only). |
| Security Officer (on-site, unaware) | 3 | [#11] On-site cover security personnel who do not know SCP specifics (covered by on_site_cover_staff recurring costs). |
| Maintenance / Janitorial (on-site, unaware) | 4 | [#11] Facility operations personnel for day-to-day upkeep (cover staff; unaware of anomaly). |
| Administrative Staff | 2 | [#11, #17] On-site administrative/records staff used to sustain cover-story paperwork and basic facility administration (cover staff). |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling reasonable mid-point estimates; uncertainty remains around testing cadence, breach frequency/severity and policy choices for contingency/insurance sizing, so estimates carry moderate confidence.