SCP-3128
Safe
~
medium confidence
SCP-3128
Expected annual
$16.0M
One-time setup
$110.2M
Annual recurring
$15.6M
Personnel
9
One-time setup and containment hardware are modest, but large economic contingency reserves dominate costs. Total one-time capital outlay is dominated by strategic escrow and intervention seed funds; recurring costs are driven by emergency-fund replenishment, staffing, legal/coordination, and ongoing economic research/monitoring.
One-Time Capital Costs
Total: $110.2M
Annual Recurring Costs
Total: $15.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.6M/yr
Normal uneventful year with routine containment, monitoring, and planned replenishment of contingency funds.
no incidents
routine monitoring
scheduled exercises
🚨
Minor Incident
$16.1M/yr
Limited PoI activity or small recovery operation requiring an MTF deployment, localized legal work, and supplemental forensics/PR.
local PoI detection
single MTF deployment
targeted legal/forensic response
🚨
Major Operation
$17.6M/yr
Complex international extraction/extradition or multi-jurisdictional intervention requiring extended MTF deployments, safehouses, and elevated legal/liaison costs.
international PoI capture
large-scale covert operation
significant legal action
🚨
Catastrophic Economic Event
$90.6M/yr
An event in which SCP-3128 gameplay causes systemic real-estate or market collapse requiring large-scale covert interventions and drawing heavily on strategic escrow.
widespread market contagion
systemic real-estate shock
need for national-scale intervention
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Two armed guards per shift, 24/7 coverage (6 total) included in security payroll estimates. |
| Security Supervisor | 1 | [#3] On-site security supervisor included in staffing estimates. |
| Research Scientist | 2 | [#10] Senior researcher(s) with Level-4 clearance required for access authorization and oversight. |
Confidence Notes
Containment hardware, staffing, and many operational line items are well-scoped (medium confidence). Major uncertainty remains around policy choices for contingency fund sizing and the unpredictable scale of economic interventions, which causes substantial variance in one-time and annual costs.