SCP-3129
Euclid
~
medium confidence
SCP-3129
Expected annual
$25.0M
One-time setup
$325.1M
Annual recurring
$21.0M
Personnel
69
Estimated initial capital/setup costs approximately $325,112,500 one-time, with baseline annual operating costs of ~$21,037,500. Major cost drivers are personnel (MTF teams and 24/7 monitoring), vehicle/RF hardware and ingest infrastructure, and a large national water-dosing contingency/reserve.
One-Time Capital Costs
Total: $325.1M
Annual Recurring Costs
Total: $21.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$21.0M/yr
Typical year with routine monitoring, regional interventions, and occasional localized treatment operations; no major city water-dosing events or national incidents.
routine_monitoring
localized_interventions
no_mass_water_dosing
🚨
Minor Incident
$25.0M/yr
Above-average incident year with multiple localized outbreaks requiring extra deployments, additional clinic-based treatments, and elevated takedown/escalation spending.
increased_deployments
localized_stage_2_clusters
elevated_social_media_spread
🚨
Major City Water Dosing Event
$48.5M/yr
A major-city Stage 2/3 outbreak requires covert large-scale amnestic water-dosing for a single major municipality.
major_city_stage_3_outbreak
municipal_water_dosing_required
🚨
Catastrophic National Outbreak
$296.0M/yr
Multiple major municipalities simultaneously require mass amnestic deployment, triggering use of national contingency reserves and extensive legal/cover operations.
widespread_multi-city_outbreaks
national_scale_water_dosing_and_coverup
Personnel
69 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Analyst | 9 | [#3] 24/7 monitoring analysts and supervisors (6–12 FTEs; midpoint used). |
| Security Officer / MTF Agent (MTF Tau-3) | 50 | [#4] Regional MTF Tau-3 teams (5 regional teams; 40–60 personnel total; midpoint used). |
| Research Scientist / Clinical Staff | 10 | [#12] Cognitive scientists, psychiatrists, medics for treatment and monitoring (5–15 specialists; midpoint used). |
Confidence Notes
Mid-range numeric estimates are used (midpoints) for many ranges; frequencies of events (deployments, municipal water-dosing usage) are highly uncertain. Analyst baseline summary was used to guide sizing [#27]; large contingency items (#28) are long-tail and raise one-time totals substantially.