SCP-3193
Unknown
~
medium confidence
SCP-3193
Expected annual
$7.0M
One-time setup
$9.4M
Annual recurring
$6.4M
Personnel
22
Upfront capital to bring a mid-tier Site-62 testing and containment suite online is approximately $9.4M, driven largely by site hardening, contingency reserves, and specialized anechoic lab construction. Annual operating costs are roughly $6.4M/yr, dominated by specialized staff wages, ongoing research/monitoring, rapid-response readiness, and legal/containment operations.
One-Time Capital Costs
Total: $9.4M
Annual Recurring Costs
Total: $6.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.4M/yr
Normal year with no major public incidents; regular testing, monitoring, and readiness maintained.
no public broadcast
routine testing and research
regular monitoring & takedown activity
🚨
Minor Incident
$7.2M/yr
Localized Berserkir Event requiring site response, limited casualties, forensic cleanup, and localized legal/PR action.
accidental store/stream broadcast
small-scale public exposure
single-site MTF deployment
🚨
Major Berserkir Event
$10.1M/yr
Large multi-site event with significant casualties, major cleanup, broad legal/PR response and larger amnestic/settlement costs.
city-scale broadcast
mass casualties
national media exposure
🚨
Catastrophic Public Exposure
$21.4M/yr
Full public exposure / widespread broadcast causing mass casualties, requiring use of contingency reserve and long-term remediation.
nationwide broadcast
major media scrutiny
requirement for mass amnestics / national-level cover-up
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | 1 PI, 2 audio engineers, 2 neuroscientists, 1 thaumaturgy specialist per analyst notes [#6]. |
| Security Officer / MTF Agent | 10 | 24/7 guarding and rotation staffing (8–12 guards indicated) [#7]. |
| Medical Officer | 4 | On-call trauma surgeons, paramedics and medical support staff to manage casualties and amnestic administration [#9, #19]. |
| Administrative Staff | 2 | Site administration, database/access-control management and legal/PR coordination support reflected in staff wage pool [#24, #18]. |
Confidence Notes
Estimates are based on analyst-provided ranges and historical incident data; capital and staffing needs are reasonably well-defined, but per-event costs, legal settlements, frequency of broadcasts, and program scaling carry substantial uncertainty.