SCP-320
Euclid
~
medium confidence
SCP-320
Expected annual
$7.1M
One-time setup
$66.5M
Annual recurring
$7.0M
Personnel
29
Initial capital/setup costs are dominated by vault construction, redundant/ off-site containment and a large catastrophic incident reserve (~$66.5M total one-time). Recurring annual costs center on personnel, external contracting, contingency funds and maintenance (~$7.01M/yr).
One-Time Capital Costs
Total: $66.5M
Annual Recurring Costs
Total: $7.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.0M/yr
Normal uneventful year with routine operations, maintenance, research and secrecy operations.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$7.5M/yr
Localized uncontrolled acceleration or mechanical failure causing limited infrastructure damage, equipment replacement and small-scale evacuations.
localized_uncontrolled_acceleration
equipment_damage
small_evacuations
🚨
Catastrophic Breach
$57.0M/yr
Severe containment failure or acceleration beyond control causing municipal-scale damage requiring major remediation and use of catastrophic reserve.
uncontrolled_acceleration_beyond_containment
infrastructure_damage
large_scale_evacuations
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#11] Armed guards and rotations to secure the vault and prevent unauthorized access. |
| Research Scientist | 10 | [#12] Theoretical/experimental physicists and engineers for study and containment operations (8–12 FTEs estimated). |
| Engineer / Maintenance | 6 | [#13] Facilities engineers, HVAC techs, robotics techs, crane operators and technicians for maintenance. |
| Medical Officer | 1 | [#17] Onsite physician/trauma nurse and occupational health monitoring. |
Confidence Notes
Estimates are grounded in analyst ranges for engineering and staffing but the object’s nonlinear and catastrophic risk profile creates wide uncertainty (especially for the catastrophic-reserve magnitude and incident probabilities).