Expected annual
$40K
One-time setup
$1.2M
Annual recurring
$12K
Personnel
0.1
Estimated one-time setup and contingency reserves are substantial (~$1.22M) driven by potential land purchase, retrofit, controlled-test prep and demolition/contingency funds; baseline recurring costs are minimal (~$11.5k/yr) driven by cataloging, monitoring maintenance and protocol refreshers.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $12K/yr
Cost Scenarios
📊
Baseline
(baseline)
$12K/yr
Storage-only posture: SCP-322 kept locked in Storage Unit-3 with monitoring, quarterly audits, and SOP refreshers; no deployments or facility conversion.
storage_only
no_deployments
no_conversion
🚨
Single Controlled Deployment
$190K/yr
A one-off, approved field test/deployment: includes test-site prep, transport, excavation, short-term security, watering, and extra scientific analysis in that year.
approved_test_proposal
field_deployment
research_activation
🚨
Full Operationalization
$1.1M/yr
Foundation purchases/leases land and converts the produced castle into a forward base; includes one-time retrofit/hookup and large recurring garrison/security and facilities costs.
decision_to_retain_castle
forward_base_conversion
land_purchase
🚨
Major Incident
$712K/yr
Uncontrolled growth/multiple-seed activation or hazardous emergent behavior requiring emergency demolition, large-scale containment and extended operations.
uncontrolled_growth
multiple_seed_activation
hazardous_servants_emergence
Personnel
0.1 total
| Role | Count | Notes |
|---|---|---|
| Catalog Specialist / Custodian | 0.1 | [#3] Part-time/shared specialist responsible for quarterly audits and chain-of-custody (~0.1 FTE reflected in staff_wages). |
Confidence Notes
Notes provide explicit ranges for most line items allowing reasonable mid-point estimates; however large conditional items (land purchase, BSL buildout, demolition) have wide ranges and scenario-dependent occurrence, reducing confidence to medium.