SCP-3212
Unknown
~
medium confidence
SCP-3212
Expected annual
$8.5M
One-time setup
$27.9M
Annual recurring
$8.2M
Personnel
66
Initial one-time capital and setup is approximately $27.9M driven by site construction, modular interiors, and a large contingency reserve; ongoing annual operations are about $8.19M driven primarily by staffing, accommodations, and contingency/repair budgets.
One-Time Capital Costs
Total: $27.9M
Annual Recurring Costs
Total: $8.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.2M/yr
Normal year with routine maintenance, staffing, and occasional minor repairs but no major incidents.
routine_repairs
routine_staffing_and_operations
🚨
Minor Incident
$8.6M/yr
Localized incidents such as repeated audio-device damage, frequent interior reconfigurations requiring surge repairs and emergency response deployments.
audio_device_damage
frequent_room_reconfigurations
adjacent-room_emergencies
🚨
Major Breach
$13.2M/yr
Aggressive episode or structural incident requiring major reconstruction, extended emergency operations, or partial relocation.
large_structural_damage
escalated_aggression
containment_reconstruction
Personnel
66 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 45 | [#8] Minimum of 30 sighted personnel required on-site at all times; staffing multiplier and rotations account for 45 FTE security/operational staff. |
| Research Scientist | 8 | [#9, #16] Dedicated research team for study of SCP and remote-manipulation research (midpoint of 6–10 researchers). |
| Engineer / Maintenance | 5 | [#9] Maintenance and technical staff to repair modular interiors, cabling and equipment (midpoint of 4–8 techs). |
| Medical Officer / Paramedic | 3 | [#9, #11] On-site medical staff to run clinic and respond to injuries (midpoint of 2–4 medics). |
| Administrative Staff | 2 | [#9] Admin/HR/logistics personnel supporting site operations. |
| Data Analyst | 3 | [#17] Audio analysis and incident logging staff (2–4 analysts; midpoint used). |
Confidence Notes
Cost line items are based on analyst ranges and midpoints; construction and salary variability and the unquantified frequency/severity of SCP-3212's interior alterations introduce moderate uncertainty (notes indicate ±30–50% variability and unknown activity rates).