SCP-3247
Euclid
~
medium confidence
SCP-3247
Expected annual
$7.8M
One-time setup
$13.7M
Annual recurring
$7.6M
Personnel
18
Initial one-time capital is approximately $13.7M driven by sensors, radar/LIDAR units, vehicles, and a contingency reserve; annual recurring costs are roughly $7.6M driven by staffing, research/monitoring, aircraft contracts, and legal/cover operations.
One-Time Capital Costs
Total: $13.7M
Annual Recurring Costs
Total: $7.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.6M/yr
Normal operational year with routine monitoring, scheduled maintenance, research, and occasional small recoveries.
no_major_public_incident
routine_recoveries
scheduled_research_and_maintenance
🚨
Minor Incident
$8.1M/yr
Single-person or small-scale incident requiring targeted search/recovery, several autopsies, additional cleanup and modest legal/cover expenditures.
single_person_triggered_ascent
local_media_report
small_search_and_cleanup
🚨
Major Breach
$12.6M/yr
Multi-person or public incident with extensive media exposure, large-scale search/recovery, heavy helicopter/satellite tasking, legal settlements and contingency drawdown.
multi_person_public_breach
national_media_exposure
litigation_and_settlements
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Field containment, staffed kiosks and quick-response teams; hazard pay included in loaded payroll. |
| Research Scientist | 4 | Lead controlled testing, data analysis, and instrumentation management. |
| Field Operator / Technician | 4 | Sensor maintenance, UAV operators (pilots' salary pooled here), vehicle operators and on-site technicians. |
| Administrative Staff | 2 | Coordination with cover units, permits, records management and logistics. |
| Medical Officer | 1 | Routine medical support and incident medical oversight. |
| Engineer / Maintenance | 1 | Facilities, vehicle and sensor system maintenance. |
Confidence Notes
Estimates are median-based from analyst ranges; many line items have wide ranges and location-dependent uncertainty (terrain, incident frequency, and contracting costs), so totals are moderately reliable but subject to ±30–50% variance.