SCP-3248
Edifice
~
medium confidence
SCP-3248
Expected annual
$613K
One-time setup
$536K
Annual recurring
$607K
Personnel
6
One-time acquisition and hardware/containment retrofits are the primary upfront costs (~$0.54M). Ongoing annual costs are driven by security staffing, research, and administrative overhead (~$0.61M/yr).
One-Time Capital Costs
Total: $536K
Annual Recurring Costs
Total: $607K/yr
Cost Scenarios
📊
Baseline
(baseline)
$607K/yr
Normal year with routine monthly events and no major incidents; standard research and containment operations.
predictable_monthly_SCP-3248-1_events
no structural damage or public exposure
🚨
Minor Incident
$649K/yr
A single minor incident requiring forensic cleanup, moderate repairs and extra legal/PR work.
small structural damage or bio-residue post-event
local reports requiring PR/legal intervention
🚨
Major Breach
$957K/yr
Significant escalation (fire/structural failure, contamination, or need to relocate/encase site) requiring large one-off expenditures and elevated annual response costs.
major structural damage (fire/flood)
manifestation escalation or public exposure requiring relocation/encasement
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 3 | [#11] Three full-time guards covering shifts (salaries included in staff_wages). |
| Technician / Field Tech | 2 | [#12] Two technicians on-site during monthly activation (hourly staffing paid; costs in staff_wages). |
| Resident Agent / Custodian | 1 | [#2] Agent Carnigan (on-site occupant) receiving hazard stipend and allowances. |
Confidence Notes
Line items are well-enumerated with vendor-type ranges, but many recurring categories (research intensity, forensic frequency, contingency usage) have wide ranges; mid-point estimates used.