SCP-3264
Euclid
~
medium confidence
SCP-3264
Expected annual
$2.9M
One-time setup
$2.9M
Annual recurring
$2.8M
Personnel
28
First-year one-time capital and setup costs are approximately $2.89M (dominated by a remediation contingency and equipment/setup). Ongoing annual operations are approximately $2.77M/yr, driven primarily by personnel wages, ongoing cover-story/legal expenses, and contingency reserves.
One-Time Capital Costs
Total: $2.9M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with no major incidents; routine operations, maintenance, training, and legal/cover upkeep.
no breach
normal maintenance
scheduled training
🚨
Minor Incident
$2.9M/yr
Localized incident (equipment damage, short power outage, small contamination event) requiring repair, overtime, extra decon, and elevated PR/legal response.
equipment failure
short-term contamination event
localized power outage
🚨
Environmental Remediation
$5.3M/yr
Confirmed major B12 leakage or contamination requiring extensive remediation, regulatory/legal response, large-scale cleanup contracts, and prolonged oversight.
confirmed B12 radiological contamination
regulatory/environmental remediation required
large-scale cleanup contracts
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#1] On-site perimeter security (2 guards per 12-hour shift; ~10 FTE to cover rotations). |
| Remote-monitoring Operator | 6 | [#2] Continuous CCTV/sensor monitoring (3 shifts, ~6 FTE). |
| Research Scientist | 4 | [#3] Observation researchers covering 06: 0–20: 0observation windows and analysis. |
| Engineer / Maintenance | 7 | [#4] Night maintenance crew (3–4 per night with rotations; estimated ~7 FTE). |
| Technical Writer / Archivist | 1 | [#23] Archival reporting and scientific logging staff (1–2; modeled as 1 FTE). |
Confidence Notes
Analyst notes provide detailed role and cost estimates for most categories (wage rates, equipment quotes). Uncertainty remains around ranges (CCTV/generator/decon, remediation magnitude) and the low-probability but high-cost remediation scenario, so confidence is medium.