SCP-3277
Euclid
~
medium confidence
SCP-3277
Expected annual
$2.4M
One-time setup
$2.5M
Annual recurring
$2.3M
Personnel
16
One-time capital outlays (vault upgrade, contingency reserve, specialized instrumentation) of approximately $2.46M, and recurring annual operations dominated by staff wages, bombing-range testing, and contingency/hazard reserves totaling about $2.33M/yr.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $2.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.3M/yr
Normal operational year with routine testing cadence, no major incidents or loss of instances.
routine_testing
no_breaches
standard_maintenance
🚨
Minor Incident
$2.5M/yr
Localized incident (small containment breach, medical event, limited contamination) requiring cleanup, overtime and limited external consulting.
limited_breach
medical_treatment
targeted_cleanup
🚨
Major Incident
$4.4M/yr
Significant breach or destructive loss of an instance resulting in major environmental remediation, litigation, reconstruction attempts and accelerated R&D.
instance_loss
major_contamination
lengthy_litigation
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 6 | [#5] Dedicated guard coverage for the high-value vault: 6full-time positions (3 shifts). |
| MTF Agent / Rapid Response Team | 4 | [#8] On-call Mobile Task Force readiness (vehicles/equipment amortized); team staffing reflected here. |
| Research Scientist / Thaumatologist | 2 | [#10, #9] Senior thaumaturgical researchers (2 senior staff driving experiments); oversight (0.25 FTE) listed separately. |
| Lab Technician | 2 | [#10] Lab technicians to support experiments and sample prep. |
| Medical Officer | 1 | [#14] Onsite medic/trauma coverage during experiments (1 FTE assumed within medical readiness budget). |
| Project Manager / Administrative Staff | 0.75 | [#23] 0.75 FTE project management and administrative support included in overhead. |
| Senior Thaumatology Oversight | 0.25 | [#9] Senior thaumaturgical staff allocated at ~0.25 FTE for approvals and supervision. |
Confidence Notes
Line-item estimates are provided by analyst notes for most categories (medium confidence). Uncertainty remains around choices (instrument purchase vs contract for materials analysis), frequency of destructive tests, and exact staffing/MTF composition, which affects recurring totals.