SCP-3280
Euclid
~
medium confidence
SCP-3280 — After the Storm
Expected annual
$6.3M
One-time setup
$31.9M
Annual recurring
$6.1M
Personnel
25
Initial one-time containment and hardening of the seized Johnston Labs site is expensive due to facility upgrades, blackout/jamming hardware, and large contingency reserves; ongoing annual costs are dominated by staff wages, R&D, and program overhead. Total one-time contingency and mitigation reserves drive the majority of capital expenditure while continuous operations and specialized countermeasure R&D drive recurring costs.
One-Time Capital Costs
Total: $31.9M
Annual Recurring Costs
Total: $6.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.1M/yr
Normal operational year with no major incidents; routine containment, R&D, and training continue as budgeted.
steady_state_operations
scheduled_R&D
routine_maintenance
🚨
Minor Incident
$6.4M/yr
Localized containment breach or equipment failure requiring emergency response, short-term overtime, evidence disposal, and limited PR/legal expenditures.
localized_breach
equipment_failure
minor_media_exposure
🚨
Major Breach
$11.1M/yr
Significant breach reaching external areas or major media exposure requiring large-scale emergency response, partial demolition/isolation, and substantial legal/compensation costs.
breach_to_outside
urban_exposure
major_media_leak
🚨
Catastrophic Breach
$34.1M/yr
Full containment failure resulting in regional quarantine or widespread information proliferation requiring demolition, large-scale evacuation, and global mitigation actions.
containment_failure
information_proliferation
regional_health_emergency
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#11] Round-the-clock guards, rapid-response and site-security staffing to maintain 24/7 containment posture. |
| Research Scientist | 5 | [#12] Memetic/info-hazard specialists, cognitive scientists, and containment engineers focused on study and countermeasure development. |
| Site Director / Executive Staff | 1 | [#11] Senior site management and liaison responsibilities. |
| Engineer / Maintenance | 2 | [#11] Facility technicians for HVAC, structural systems, generators, jammers and routine maintenance. |
| CCTV / Video Analyst | 2 | [#11] Continuous monitoring, logging, and initial forensic analysis of feeds and sensor data. |
| Administrative Staff | 1 | [#11] Site administration, scheduling, and liaison paperwork. |
Confidence Notes
Estimates use midpoints of wide ranges provided; several items (contingency demolition, evacuation, global mitigation) have very wide / scenario-dependent ranges which lowers confidence. Recurring staffing and R&D figures are better defined, but emergency/contingency costs remain highly uncertain.