SCP-3292 Euclid ~ medium confidence
SCP-3292
Expected annual
$3.0M
One-time setup
$3.0M
Annual recurring
$2.9M
Personnel
15
Initial capital costs are primarily land, entrance hardening and contingency (~$3.0M one-time). Annual costs are dominated by staff wages, manual expedition/mapping and research operations (~$2.92M/yr).
🏗️ One-Time Capital Costs Total: $3.0M
Facilities $1.2M
[#1, #3, #4, #19] Purchase of reserve land and closing costs, construction of gatehouse/ranger station, perimeter fencing/signage installation, and hardening/transfer vestibule at the entrance.
Incident Contingency Fund $1.0M
[#24] Recommended initial contingency reserve for emergency escalations (temporary bases, contractors, large-scale recovery).
Initial Research And Lab Setup $400K
[#20] Setup/upgrade of Site-990 lab capacity and purchase of high-end analysis instruments required for sample analysis.
Equipment $216K
[#6, #7, #17, #18, #19, #21] Procurement of vehicles, ranger uniforms and PPE, specialized non-electronic survey equipment, sample-capture kits and initial transfer container inventory, and cold-storage/freezer purchase.
Amnestic Initial Stock $75K
[#10] Initial purchase/manufacture and training stock of Class-B amnestics and secure storage setup.
Initial Training Program $25K
[#23] Initial non-electronic communications and safety training program setup for field teams.
Front Company Setup $18K
[#2] One-time legal/corporate fees to establish Halcyon Industries shell company and initial filings.
Legal Setup $15K
[#13] Initial legal set-up fees, permits and counsel to establish cover/legal posture.
It Initial Setup $15K
[#26] Initial IT/communications setup for off-site operations, secure records and cover paperwork.
🔄 Annual Recurring Costs Total: $2.9M/yr
Staff Wages $1.1M/yr
[#5, #8, #15, #22] Salaries, benefits and rostering for two on-site Level-2 guards, rotating rapid-response/security team, dedicated research staff, and medic staffing.
Research And Monitoring $1.0M/yr
[#16, #20, #25] Ongoing expedition field costs and mapping (manual surveys), annual lab operations/consumables at Site-990, and Task Force Psi-31 monitoring/endangered-species tracking allocation.
Central Overhead $300K/yr
[#30] Central Foundation overhead allocation (HR, payroll processing, procurement, central accounting) applied to site budget.
Cover Story And Legal $242K/yr
[#2, #11, #12, #13, #14, #26, #29] Ongoing front-company accounting/filing, airspace coordination/NOTAMs, covert PR/conservation cover maintenance, legal retainer, discreet local payments/hush budget, recurring IT/communications costs, and records/archive audit work.
Logistics And Transport $212K/yr
[#7, #9, #22, #28] Vehicle fuel and routine maintenance, Site-990 processing and transport logistics for trespassers, medevac retainer/expected per-use costs, and dedicated secure transport budget for specimen transfers.
Supplies And Consumables $65K/yr
[#6, #10, #17, #18, #19, #23] Replacement ranger equipment/PPE, amnestic resupply and medical administration consumables, film/analog survey consumables & calibration, specimen consumables, and ongoing refresher training costs.
Facilities Maintenance $44K/yr
[#3, #4, #19, #21, #27] Gatehouse utilities/maintenance, fencing upkeep, vestibule/container maintenance, cold-storage electricity/maintenance, and site utilities (water/sewage/heating).
Cost Scenarios
📊 Baseline (baseline) $2.9M/yr
83.0% probability / year
Normal year with routine operations, mapping, research and no major incidents.
routine_field_campaigns normal staffing/maintenance
🚨 Minor Incident $3.0M/yr
15.0% probability / year +$75K vs baseline
Localized incident (trespass, small removal attempt) requiring Site-990 processing, extra staff overtime, limited repairs and additional amnestics.
trespasser incidents small extraction attempts limited medevac/use of contingency
🚨 Major Breach $4.1M/yr
2.0% probability / year +$1.2M vs baseline
Significant escalation (mass egress, large-scale removal attempt) requiring contingency spending, contractor mobilisation, extended operations and major repairs.
mass egress of SCP-3292-3 coordinated removal attempt major recovery operation
👥 Personnel 15 total
Role Count Notes
Security Officer / Guards (Level-2, on-site) 2 [#5] Two on-site ranger/guard staff stationed outside the entrance.
Rapid Response / MTF Security (rotating) 6 [#8] Rotating standby team (4–8 personnel) from nearest site for incident response.
Research Scientist 4 [#15] Dedicated field/research staff (field biologists, botanists, archaeologists).
Medical Officer / Medic 1 [#22] Medic staffing for field rotations and medical administration.
Driver / Transport Specialist 1 [#28] Secure transport/drivers for sample transfers to Site-990.
Administrative / Cover Liaison 1 [#2, #26] Small administrative/cover staff supporting Halcyon front company and records/IT.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, enabling midpoint estimates; uncertainty remains around land purchase vs lease, expedition intensity, and frequency/severity of incidents, so medium confidence is appropriate.
← SCP-3291 ↑ All SCPs SCP-3293 →