SCP-3293
Keter
~
medium confidence
SCP-3293
Expected annual
$7.6M
One-time setup
$6.9M
Annual recurring
$7.4M
Personnel
30
Initial capital expenditures are dominated by construction of a hardened containment cell, secure anomalous-item vault, robotics, and a sizeable emergency reserve; recurring costs are driven by sustained R&D programs and a large security/response staffing posture.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $7.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.4M/yr
Normal operational year with no major containment breach; routine operations, R&D, and scheduled maintenance only.
no breach
routine R&D activity
scheduled maintenance
🚨
Minor Incident
$7.9M/yr
Localized containment breach or device discovery requiring rapid-response deployment, limited repairs, and a one-off airlift or legal action.
small containment breach
single-device hazardous disposal
limited facility damage
🚨
Major Breach
$12.4M/yr
Significant containment failure requiring large-scale recontainment, major facility repairs/rebuild, public exposure mitigation, and large use of contingency funds.
full containment failure
multiple-device deployment
public/police exposure
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Operator / Control-room Operator | 6 | [#5] Six FTE control-room monitoring personnel to provide 24/7 coverage (line #5). |
| Security Officer / MTF Agent (on-site) | 6 | [#6] Six on-site security personnel for constant presence (line #6). |
| Rapid Response Team Specialist | 12 | [#6] Twelve rapid-response specialists for emergency recontainment (line #6). |
| Search Technician | 2 | [#8] Two search staff for material-control and regular strip searches (line #8). |
| Decontamination / Forensic Technician | 2 | [#9] Two technicians to perform daily inspections, forensic sweeps and lab runs (line #9). |
| Security Supervisor / Sergeant | 2 | [#6] Supervisors and overtime staffing for security & RRT management (line #6). |
Confidence Notes
Line-item estimates are detailed and based on typical Foundation capital and personnel costs, but the anomalous, reality-altering nature of SCP-3293 and potential for escalation make long-term recurring estimates uncertain.