SCP-3315
Safe
~
medium confidence
SCP-3315
Expected annual
$527K
One-time setup
$124K
Annual recurring
$520K
Personnel
7
One-time setup is approximately $124k driven by custom copper‑shielding, Faraday retrofit, TO‑3 pods and transport/monitoring equipment; recurring annual costs are ~ $520k driven primarily by dedicated research and security staff wages and ongoing testing/maintenance.
One-Time Capital Costs
Total: $124K
Annual Recurring Costs
Total: $520K/yr
Cost Scenarios
📊
Baseline
(baseline)
$520K/yr
Normal uneventful year with scheduled testing, maintenance, and routine staffing.
routine testing
scheduled maintenance
no major incidents
🚨
Minor Incident
$570K/yr
Small accidental damage to shielding/equipment or localized containment issue requiring repairs and overtime.
equipment failure
localized shielding damage
minor containment breach repairs
🚨
Research Scale Up
$620K/yr
Research breakthrough or expanded testing program requiring temporary scale-up of instrumentation and short-term staffing.
expanded experiment campaign
additional instrumentation procurement
short-term contracted staff
🚨
Major Breach
$770K/yr
Significant containment failure or loss/unauthorized removal requiring extended recovery operations, legal response, and replacement equipment.
breach requiring recovery operation
public exposure / legal incident
major equipment replacement
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Project Head | 1 | Project head / senior researcher responsible for approvals and oversight; maps to [#12]. |
| Research Scientist / Technician | 2 | Full-time researchers/technicians to run tests, inspect pods, and maintain instruments; maps to [#5, #7, #12]. |
| Security Officer / MTF Agent | 3 | Three guards for 24/7 coverage (shared site security if applicable); maps to [#13]. |
| Administrative Staff | 1 | Part-time administrative support (0.2–0.5 FTE equivalent) for scheduling, approvals, and procurement; maps to [#14]. |
Confidence Notes
Ranges in analyst notes are specific but several items (frequency of test campaigns, exact staffing model, and incident rates) are uncertain; numeric midpoints used and several costs are annualized estimates.