SCP-3316
Euclid
~
medium confidence
SCP-3316
Expected annual
$19.4M
One-time setup
$19.4M
Annual recurring
$19.1M
Personnel
97
Initial capital for property control, lab build-out and contingency reserves (~$19.5M) with large annual recurring costs driven mainly by nightly perimeter/security, amnestic administration, victim medical compensation and monitoring (~$19.1M/yr).
One-Time Capital Costs
Total: $19.4M
Annual Recurring Costs
Total: $19.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$19.1M/yr
Normal year with recurring containment operations, nightly perimeter work, routine research and regular administration/legal activity; no large public exposure.
routine_nightly_operations
no_public_disclosure
🚨
Minor Incident
$21.1M/yr
Localized public awareness event (viral clip or small whistleblower) requiring targeted emergency amnestics, an intensified PR push and limited settlements.
localized_video
small_whistleblower
minor_media_exposure
🚨
Major Breach
$39.1M/yr
Significant public discovery or mass exposure requiring large-scale amnestic operations, major emergency PR/legal campaign, mass settlements and possible relocation.
viral_mass_exposure
large_scale_whistleblowing
government_inquiry
Personnel
97 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 55 | [#3, #25] Rotating nightly guards for perimeter/cordons plus counter-surveillance personnel. |
| Monitoring Analyst | 6 | [#1] 24/7 OSINT, watchdesk and social-media/911 monitoring team (4–8 FTE noted; midpoint used). |
| Rapid Response Team (Medics / Technicians / Drivers) | 12 | [#4, #16] Retrieval teams, ambulance/van crews, medics and technicians for site retrievals and amnestic administration. |
| Research Scientist | 6 | [#9, #23] Ocular pathology and experimental research leads. |
| Research Technician / Lab Staff | 8 | [#9, #23] Lab technicians handling sequencing, histology, cryostorage and experiment support. |
| Medical Officer / Nurse | 8 | [#5, #4] Nursing staff and medical oversight for amnestic administration and post-care monitoring. |
| Site Director / Administrative Staff | 2 | [#13, #26] Project head, legal/administrative liaison and regulatory coordination staff. |
Confidence Notes
Analyst notes provide many line-item ranges and operational requirements, but large ranges (especially for amnestic administrations, property costs and contingency responses) create significant uncertainty. Estimates use midpoints and conservative assumptions; actual costs could vary materially with choice of property strategy, event frequency, and scale of emergency responses.