SCP-3320 Keter ~ medium confidence
SCP-3320
Expected annual
$2.2B
One-time setup
$1.9B
Annual recurring
$2.0B
Personnel
200
Establishment of Site-3320 requires large one-time capital for a hardened polar base and specialized R&D (~$1.9B). Recurring annual operations are dominated by interceptor/missile expenditure, dedicated ship operations, personnel, and long-term provisioning (~$2.0B/year).
🏗️ One-Time Capital Costs Total: $1.9B
Planetary Risk Mitigation Reserve $1.0B
[#24] Long-term contingency / planetary risk mitigation fund (recommended minimum reserve used).
Facilities $300.0M
[#1] Bouvet Island site construction, helipad, reinforced shelters, pier, environmental protection and hardened infrastructure; midpoint estimate used.
Additional Ordnance R And D Capital $200.0M
[#8] One-time R&D/procurement for heavier/specialized ordnance contingency (midpoint of range).
Decommissioning And Remediation $100.0M
[#25] Decommissioning and long-term site remediation reserve (midpoint).
Specialized Tools R And D Capital $80.0M
[#17] Capital portion of specialized containment tooling and prototype R&D (chemical agents, focused-energy devices).
Salvage Asset Capital $50.0M
[#9] Capital purchase/charter or dedicated salvage asset acquisition (tugs, barges, heavy-lift gear) chosen near midpoint.
Environmental Response Reserve $50.0M
[#14] One-time larger incident response reserve for blast/environmental remediation (explicit $50M reserve noted).
Liability Reserve $25.0M
[#20] Initial insurance/liability reserve to cover maritime compensation and legal contingencies.
Initial Research And Lab Setup $20.0M
[#16] Specialized lab buildout and initial specialized instrumentation for exotic-matter and materials research.
Monitoring Initial Installations $20.0M
[#15] Initial sensor installations: hydrophones, seismographs, radar upgrades, satellite tasking integration hardware.
Deepwater Rov Capital $15.0M
[#10] ROVs/submersible purchase and inspection equipment (mid-range estimate).
Patriot Battery Setup $10.0M
[#5] Initial emplacement and civil-engineering for Patriot battery (midpoint of estimate).
Directed Jamming Installation $10.0M
[#11] Installation of directional radio jamming / EM suppression arrays at Site-3320.
Power Generation Capital $8.0M
[#12] Base power generation and storage capital (generators/renewables, batteries) for extreme climate.
Communications And Cybersecurity Setup $8.0M
[#26] Initial secure communications and cybersecurity hardening capital.
Medevac Capital $2.0M
[#21] Capital for medevac equipment and trauma readiness (midpoint).
Lease And Legal Setup $1.0M
[#2] One-time legal/setup costs for lease/perpetual agreement administration and host-nation compensation setup.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $2.0B/yr
Missile Expenditure $1.4B/yr
[#6] Annual interceptor expenditure (midpoint of $480M–$2.4B range; accounts for multiple activations and per-missile cost).
Seagoing Asset Ops $150.0M/yr
[#4] Dedicated surface warship (Type 45) operational costs (deployment tempo, maintenance, crew, drydock refits).
Ammunition Stockpile Maintenance $100.0M/yr
[#7] Storage, rotation, replacement procurement and logistics overhead for missile stockpiles.
Research And Monitoring $70.0M/yr
[#15,#16] Ongoing scientific research program and multi-sensor monitoring contracts (satellite tasking, hydrophones, analysis).
Weapon System Upgrades $50.0M/yr
[#23] Amortized annual provisioning toward major weapon/radar upgrades and replacement cycles.
Planetary Risk Provisioning $50.0M/yr
[#24] Annual provisioning to the long-term planetary contingency fund.
Logistics And Transport $34.0M/yr
[#9,#12,#13] Transport/resupply (ice-class vessels, helicopters), fuel deliveries, and average salvage/towing operation provisioning amortized into annual logistics.
Additional Ordnance Ongoing $25.0M/yr
[#8] Ongoing testing, procurement and smaller-scale R&D for higher-yield or bespoke ordnance.
Staff Wages $15.0M/yr
[#3] Permanent on-site staffing (200 FTE equivalent at ~$75k fully loaded average = $15M/year).
Training $15.0M/yr
[#22] Live-fire exercises, simulations, towing/salvage drills and associated consumables.
Cover Story And Legal $10.0M/yr
[#2,#18] Disinformation/media management program plus small host-nation/stipend and ongoing legal/liaison costs.
Patriot Battery Sustainment $10.0M/yr
[#5] Personnel, sustainment, calibration and training for the Patriot battery.
Insurance Reserve Provisioning $10.0M/yr
[#20] Annual provisioning into insurance/liability funds to cover claims and commercial disruptions.
Supplies And Consumables $6.0M/yr
[#27] Food, medical supplies, PPE, spare parts and routine consumables.
Facilities Maintenance $5.0M/yr
[#1] Ongoing maintenance, environmental protection, pier and infrastructure upkeep for Site-3320.
Diplomatic And Intelligence Operations $5.0M/yr
[#19] Diplomatic, intelligence and clandestine liaison costs to blunt international inquiries and coordinate secrecy.
Emergency Medical $3.0M/yr
[#21] Medevac readiness, surgical team rotations, and trauma-care staffing/supplies.
Communications And Cybersecurity Om $2.0M/yr
[#26] Ongoing comms, cybersecurity operations and counterintelligence technical support.
Deepwater Rov Ops $1.5M/yr
[#10] Deployment, maintenance and operations for ROVs/submersibles and underwater inspection equipment.
Directed Jamming Om $1.0M/yr
[#11] Power, O&M and technical staffing for directional jamming arrays.
Cost Scenarios
📊 Baseline (baseline) $2.0B/yr
74.0% probability / year
Normal year with standard activation frequency and routine operations (annual missile usage, ship rotation, research, and logistics as budgeted).
scheduled_activations routine_maintenance
🚨 Minor Incident $2.5B/yr
20.0% probability / year +$480.0M vs baseline
Year with a temporary spike in activation intensity or frequency leading to increased missile expenditure but no major infrastructure damage.
increased_activation_rate munitions_spike
🚨 Major Breach $3.2B/yr
5.0% probability / year +$1.2B vs baseline
Significant escalation where multiple intercept attempts fail/repeat, requiring heavy salvage, major repairs, accelerated R&D and large additional missile expenditure.
multiple_failed_intercepts structural_escalation
🚨 Catastrophic Breach $7.0B/yr
1.0% probability / year +$5.0B vs baseline
Rare, high-impact year where SCP-3320's energy/output increases markedly, forcing planetary-contingency measures, large-scale procurement and emergency global coordination.
exponential_power_increase interstellar_launch_attempt
👥 Personnel 200 total
Role Count Notes
Site Director / Executive Staff 1 [#3] Senior command and liaison.
Security Officer / MTF Agent 50 [#3] Frontline security teams and rotational MTF coverage to enforce exclusion zone.
Research Scientist 30 [#3] Scientific staff for materials, exotic-matter research and linguistics.
Engineer / Maintenance 40 [#3] Power, structural, and equipment maintenance for remote site and launch mitigation systems.
Munitions Technician 15 [#3] Missile handling, storage, and launcher maintenance personnel.
Communications / Radar Technician 25 [#3] Radar, jamming, and secure communications operators and analysts.
Cooks / Logistics 15 [#3] On-site logistics, food services and resupply coordination.
Administrative Staff 10 [#3] Admin, HR, finance and legal liaisons.
Medical Officer 4 [#3] On-site medics and rotating surgical capability.
Support Technicians 10 [#3] General technical support and seasonal/rotational personnel.
📋 Confidence Notes
Analyst notes provide detailed line-item ranges allowing mid-range estimates, but SCP unpredictability (activation intensity, escalation over time) and potential nonlinear cost growth reduce overall precision.
← SCP-3319 ↑ All SCPs SCP-3321 →