SCP-3326
Unknown
~
medium confidence
SCP-3326
Expected annual
$3.6M
One-time setup
$4.4M
Annual recurring
$3.5M
Personnel
15
Initial capital/setup is dominated by site acquisition, bespoke temporal engineering (XACTS) and secure vault/IT buildouts, with a one-time estimate of roughly $4.41M. Recurring annual costs are driven primarily by specialized personnel payroll, on-call MTF operations and research/monitoring, totaling about $3.53M/year.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal operational year with routine monitoring, scheduled research, and no major incidents.
routine_operations
scheduled_research
no_major_breach
🚨
Minor Incident
$3.7M/yr
Localized containment deviation requiring Protocol Realignment, extra MTF mobilization and limited amnestic/legal work.
clock_deviation
protocol_realignment
temporary_entanglement
🚨
Major Breach
$6.0M/yr
Failed containment with public exposure/mass-information footprint requiring mass-amnestic deployment, large buyouts and extended MTF/relocation operations.
failed_containment
public_exposure
mass_amnestic_operations
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Site Lead / Senior Researcher | 1 | [#13] Senior researcher / site lead responsible for SCP oversight (estimated salary ~ $120k). |
| Research Scientist | 2 | [#13] Research staff working temporal experiments and analysis (estimated salary ~ $120k each). |
| Technician | 4 | [#13] Technicians maintaining equipment, sensors, and lab bench work (estimated salary ~ $60k each). |
| Security Officer / On-site Guards | 5 | [#13] 24/7 rotating security staffing for site perimeter and chamber security (estimated salary ~ $40k each). |
| Administrative Staff | 2 | [#13] Administrative/clerical support for cover story maintenance, scheduling and logistics (estimated salary ~ $50k each). |
| Medical Officer | 1 | [#17] On-call medic/psych screening partial FTE included for realignment operations and monitoring (salary and on-call costs folded into medical staffing estimate). |
Confidence Notes
Many line items have wide ranges (site purchase price, bespoke XACTS R&D, contingency needs) so mid-point estimates were used; staffing and MTF costs are reasonably well-specified but anomalous-device procurement remains uncertain.