SCP-3367
Euclid
~
medium confidence
SCP-3367
Expected annual
$5.7M
One-time setup
$6.9M
Annual recurring
$5.6M
Personnel
20
Initial one-time capital and setup are approximately $6.91M driven by property/control acquisition, lab buildout, hardened facilities, legal contingencies and decommissioning reserves; annual operations are approximately $5.59M driven primarily by staff wages, ongoing research/surveys, security, maintenance, insurance and an anomaly risk premium.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $5.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.6M/yr
Normal year with routine operations, scheduled research and no major incidents.
routine_operations
scheduled_surveys
minor_equipment_replacement
🚨
Minor Incident
$6.1M/yr
Limited containment breach or equipment-damaging electrical event requiring emergency response, sensor/vehicle replacement, temporary legal/PR actions and increased contractor support.
limited_breach
sensor_or_drone_loss
civilian_sighting_or_local_exposure
🚨
Major Breach
$8.1M/yr
Large-scale breach or exposure event resulting in heavy equipment loss, multiple medical evacuations, significant legal/settlement costs and major containment remediation.
major_containment_failure
civilian_casualty_or_exposure
structural_loss
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] 24/7 on-site security staffing (6 guards + 2 supervisors average to cover rotas). |
| Special Response / Containment Agents | 4 | [#5] Rotating specialized response/containment agents for interactions and escape response. |
| Research Scientist (Senior) | 3 | [#12] Senior investigators (ectogeography, structural/electrical/materials leads). |
| Postdoctoral Researcher | 2 | [#12] Postdoctoral research staff supporting experiments and analysis. |
| Laboratory Technician | 2 | [#12] Lab techs for sample processing, instrumentation and maintenance. |
| Medical Officer | 1 | [#15] On-call paramedic/EMT coverage included in staffing costs. |
Confidence Notes
Estimates are based on detailed analyst itemization but many inputs are ranges and anomaly-driven damage/incident frequency is inherently uncertain; contingency/premium included to reflect that uncertainty.