SCP-3380
Keter
~
medium confidence
SCP-3380
Expected annual
$23.6M
One-time setup
$25.3M
Annual recurring
$23.2M
Personnel
162
Initial capital buildout (specialized containment cells, integrated OR, secure IT and transport) drives one-time costs (~$25.3M). Ongoing operations are dominated by security/medical staffing, research/monitoring, covert assets and disinformation/legal budgets, yielding ~ $23.21M/yr recurring.
One-Time Capital Costs
Total: $25.3M
Annual Recurring Costs
Total: $23.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$23.2M/yr
Normal operational year with no major incidents; standard retrieval cadence and ongoing research/monitoring.
steady surveillance
routine medical care
normal retrieval operations
🚨
Minor Incident
$23.7M/yr
Localized spike in retrievals or small public exposure requiring elevated disinformation and medical response.
localized retrieval spike
limited public exposure
additional emergency medical procedures
🚨
Major Breach
$38.2M/yr
Significant containment failure or coordinated public breach requiring large-scale retrievals, litigation, payouts, and emergency scaling.
coordinated public breach
multiple subjects exposed
national media/legal escalation
Personnel
162 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 120 | [#6] 6 guards per cell × 20 cells (24/7 coverage, includes benefits/overtime loading used in wage estimate). |
| Nurse | 20 | [#7] One full-time nurse per cell (used in medical staffing estimate). |
| Physician / Psychiatrist | 5 | [#7] Aggregate psychiatrist FTEs (0.25 FTE per cell × 20 cells = 5 FTE equivalent). |
| Psychologist | 10 | [#7] Aggregate psychologist FTEs (0.5 FTE per cell × 20 cells = 10 FTE equivalent). |
| Research Scientist / Containment Specialist | 3 | [#8] Core research/containment specialist team (2–4 staff @ ~$100k each; mid chosen). |
| Information Security Analyst / NLP Analyst | 2 | [#10] Web monitoring / automated detection analysts (1–2 analysts; 2 assumed). |
| Driver / Transport Operator | 2 | [#14] Drivers for secure transport fleet (included in staff wages). |
Confidence Notes
Many cost items are well-described (cells, staffing, monitoring) but ranges and program scale (we used a 20-subject program assumption) introduce uncertainty. Per-procedure and per-asset costs vary widely and memetic/research needs are especially hard to pin down, so estimates use midpoints and program-level assumptions.