SCP-3390
Euclid
~
medium confidence
SCP-3390
Expected annual
$5.5M
One-time setup
$162.7M
Annual recurring
$5.2M
Personnel
27
Estimated one-time capital and contingency requirements are approximately $162.7M driven primarily by permanent vault construction, site replacement/loss write-offs, and large contingency reserves; recurring annual operations are roughly $5.20M driven by security staffing, MTF readiness and ongoing research/monitoring.
One-Time Capital Costs
Total: $162.7M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal uneventful year with regular operations, monitoring, staffing and routine maintenance.
no_incident
routine_operations
🚨
Minor Incident
$5.4M/yr
Localized failure or small breach requiring repairs, limited amnestic application and short-term overtime/contractor work.
sensor_failure
localized_containment_breach
limited_amnestic_use
🚨
Major Breach
$12.7M/yr
Significant containment failure requiring heavy-lift removal, large repairs, mass amnestic deployment and replacement of infrastructure.
major_structural_damage
large_scale_removal_operation
mass_amnestic_campaign
🚨
Catastrophic Breach
$505.2M/yr
Extensive public exposure or anomalous escalation requiring national-level response, mass amnestics, infrastructure repair and long-term mitigation.
city_scale_exposure
national_response_required
mass_amnestic_and_evacuations
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Specialist / On-site Monitor | 3 | [#4] Three personnel assigned to remain and monitor SCP-3390 per containment brief; hazard pay and specialized clearances included in staff_wages. |
| Security Officer / Armed Guard | 12 | [#5] Twelve guards to provide 24/7 armed security coverage and rotations; wages included in staff_wages. |
| Mobile Task Force Agent | 12 | [#6] On-call specialized MTF personnel maintained for rapid response readiness; recurring readiness costs included in staff_wages. |
Confidence Notes
Estimates are derived from wide analyst ranges and significant site-specific variability (location, labor rates, unknown anomalous behaviour). One-time contingency and tail-risk reserves are judgment-driven, creating moderate uncertainty.