SCP-3450
Safe
~
medium confidence
SCP-3450
Expected annual
$525K
One-time setup
$1.7M
Annual recurring
$499K
Personnel
3.65
Initial one-time setup and contingency funding total about $1.68M (largely driven by contingency/reserve funds for potential public contamination), with baseline recurring costs of roughly $499k/yr driven primarily by embedded community liaisons, staff wages, legal/takedown and monitoring.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $499K/yr
Cost Scenarios
📊
Baseline
(baseline)
$499K/yr
Normal year with no major incidents: routine monitoring, takedowns at typical levels, and ongoing staffing and subscriptions.
no_widespread_reposts
routine_takedowns_and_monitoring
🚨
Minor Incident
$549K/yr
Localized reposts or increased visibility requiring extra takedowns, overtime, and modest PR response.
localized_reposting
spike_in_reports
additional_takedowns
🚨
Major Breach
$899K/yr
Wider reposting and sustained spread requiring activation of incident response reserve, staff surge, and substantial takedown/legal action.
sustained_widespread_reposts
major_site_resistance_to_takedown
🚨
Catastrophic Public Leak
$2.0M/yr
Rapid, large-scale reposting leading to near-global visibility and need for mass suppression, major PR campaigns, international legal actions and staff surges.
viral_reposting
international_spread
media_attention
Personnel
3.65 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 0.5 | [#6] Incremental guard/watch rotations and overtime assigned to custody and transfers (pro-rated FTE equivalent). |
| Custodian / Containment Officer | 0.4 | [#7] Dedicated containment officer / custodian (0.25–0.5 FTE) responsible for SOPs, access approvals and logging. |
| Embedded Community Liaison / Online Monitor | 2.0 | [#8] Two personnel embedded in relevant online communities for monitoring and takedown intelligence. |
| Research Scientist / Memeticist | 0.75 | [#14] Ongoing memetic/literary analysis allocation (0.5–1.0 FTE equivalent). |
Confidence Notes
Estimates are based on analyst-provided ranges and a well-described operational profile (Safe-class, single-drive object) but many line items have wide ranges and contingent high-cost items; this yields moderate confidence.