SCP-3504
Safe
~
medium confidence
SCP-3504
Expected annual
$8.0M
One-time setup
$12.9M
Annual recurring
$7.9M
Personnel
30
Estimated startup capital of approximately $12.9M driven by construction, marine assets and equipment; annual operating costs are roughly $7.9M driven primarily by personnel wages, transport/logistics (boats/fuel/medevac) and cover/legal expenses.
One-Time Capital Costs
Total: $12.9M
Annual Recurring Costs
Total: $7.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.9M/yr
Normal year with routine operations, maintenance and scheduled research; no major incidents or public exposure.
routine research
scheduled maintenance
🚨
Minor Incident
$8.6M/yr
Localized damage or operational incident (storm damage, small boat accident, isolated exposure requiring legal/PR work).
severe weather damage
small containment/operational mishap
temporary PR/legal engagement
🚨
Major Breach
$11.9M/yr
Significant containment failure / public exposure or host-nation discovery requiring emergency extraction, large repairs, legal/diplomatic costs and long-term remediation.
public exposure
host-nation intervention
major structural loss or mass contamination
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Outpost Captain / Executive Staff | 1 | [#1] Site leadership included in base staffing. |
| Research Scientist | 6 | [#1, #11] Senior researchers (biologist/chemist/archaeologist) and research leads. |
| Lab Technician | 4 | [#1, #11] Laboratory technical staff for sample handling, equipment operation and cold-chain management. |
| Security Officer / MTF Agent | 8 | [#1, #3] 24/7 security shifts, lookouts and armed patrol teams. |
| Boat crew | 3 | [#6, #21] Patrol boat crews and supply vessel crew. |
| Medical Officer | 3 | [#2, #16] 1 full-time doctor and 1–2 nurses/med techs for on-site medical coverage. |
| Engineer / Maintenance | 3 | [#8, #31] Generator, facility, vehicle and desalination maintenance staff. |
| Administrative Staff | 2 | [#1, #10, #26] Comms/IT, admin, records, and censorship/data management support. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling an order-of-magnitude estimate, but many costs (sovereignty negotiations, cover/legal, purchase vs lease choices, fuel needs) are highly variable so precision is limited.