SCP-3507
Thaumiel
~
medium confidence
SCP-3507
Expected annual
$23.1M
One-time setup
$43.3M
Annual recurring
$22.8M
Personnel
65
Initial capital outlay is approximately $43,270,000 driven by deep-storage construction, major R&D buildouts, and contingency reserves; baseline recurring operations are approximately $22,763,000/year driven mainly by MTF salaries, ongoing Tier‑V R&D, administrative overhead and data/monitoring operations.
One-Time Capital Costs
Total: $43.3M
Annual Recurring Costs
Total: $22.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$22.8M/yr
Normal operational year with no major containment incidents; routine monitoring, R&D progression and standard festivals/cover operations.
no_major_incident
scheduled_r&d_and_training
routine_festival_operations
🚨
Minor Incident
$24.3M/yr
Localized containment breach or festival exposure requiring temporary surge staffing, medical payouts, localized repairs and increased security presence.
localized_breach
civilian_exposure
temporary_recontainment
🚨
Major Breach
$32.8M/yr
Large-scale containment failure or Incident A-5 style event requiring major recontainment, extensive reconstruction, large compensation and emergency fund drawdown.
widespread_breach
infrastructure_damage
large_casualties
Personnel
65 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 8 | [#3] Deep-storage on-site guards (FTE count used in wage estimates). |
| Security Supervisor | 2 | [#3] Supervisors for access control and clearance management. |
| MTF Agent / Operative | 40 | [#7] Two dedicated MTF teams (Rho-15 and Rho-11), 20 operatives each; counted as on-staff operatives. |
| UAV Pilot / Data Analyst | 6 | [#11] Pilots and analysts supporting nightly drone tracking and data processing (FTEs included in staff wages). |
| Historian / Linguist / Cultural Consultant | 3 | [#18] Specialist staff for Heian-period research, translations and festival consultation (subset of contracted/onsite specialists). |
| FOB Staff / Liaison | 6 | [#13] Local FOB staff for staging, liaison and routine operations (staffing portion of FOB recurring costs). |
Confidence Notes
Analyst notes provide many line-item estimates and ranges allowing mid-range budgeting, but large uncertainty remains around multi-year R&D burn rates, probability of anomalous major incidents, and scale/timing of Tier‑V development; this yields medium confidence.