SCP-3509
Euclid
?
low confidence
SCP-3509
Expected annual
$2.8M
One-time setup
$6.8M
Annual recurring
$2.8M
Personnel
12
One-time setup and contingency funding dominate up-front costs (~$6.79M), while annual operations (staffing, research, monitoring, security and consumables) run roughly $2.8M/yr; the largest drivers are research funding and continuous staffing/security.
One-Time Capital Costs
Total: $6.8M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with no major incidents — routine operations, scheduled research and maintenance.
no_incidents
routine_operations
🚨
Minor Incident
$3.0M/yr
Localized incident requiring targeted emergency response, repairs, extra medical/forensic work and short research pause.
localized_expansion
medical_casualties
temporary_lockdown
🚨
Major Breach
$4.8M/yr
Significant containment breach requiring evacuation of nearby sectors, large-scale remediation, reconstruction and public cover actions.
area_expansion
site_level_contamination
mass_casualties
🚨
Catastrophic Breach
$17.8M/yr
Uncontrolled expansion of SCP-3509-B causing site loss, regional impact and large public exposure requiring massive remediation and replacement.
uncontrolled_area_expansion
site_loss
public_exposure
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 6 | [#1] Monitoring/research team (rotating 24/7 coverage; includes senior lead + junior researchers/techs). |
| Security Officer / MTF Agent | 6 | [#2] On-site armed guards for elevator/observation room and escorts (three-shift coverage). |
Confidence Notes
Detailed line-item estimates exist, but major uncertainties remain (frequency/severity of breach events, size of catastrophic losses, and required contingency). Many costs are order-of-magnitude judgments.