SCP-3547
Euclid
~
medium confidence
SCP-3547
Expected annual
$11.2M
One-time setup
$52.5M
Annual recurring
$10.7M
Personnel
63
Estimated one-time startup costs are approximately $52.5M driven by vault construction, global contingency reserves, R&D and HUMINT; recurring annual costs are about $10.74M driven primarily by security and specialist staff wages, medical readiness, monitoring and PSYOPS.
One-Time Capital Costs
Total: $52.5M
Annual Recurring Costs
Total: $10.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.7M/yr
Normal operational year with routine monitoring, staffing and occasional minor maintenance; no major incidents.
no major breach
routine maintenance
standard staffing levels
🚨
Minor Incident
$11.5M/yr
Localized field leak or small containment incident requiring focused response, amnestic mobilization and equipment repairs.
small sleep-field event
localized mass-unconsciousness
single-site remediation
🚨
Major Breach
$15.7M/yr
Significant breach causing large-scale staff impacts, major recontainment operations, legal/PR mobilization and repeated medical interventions.
site-wide sleep event
mass amnestic administration
large recontainment/op litigation
🚨
Catastrophic Breach
$50.7M/yr
Worst-case scenario: mass manifestation or near-civic-scale sleep-field forcing evacuations, activation of contingency reserves and huge legal/relief costs.
mass-sleep propagation
successful ceremony / manifestation
national-scale evacuation required
Personnel
63 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#3] 24/7 armed guard coverage and rapid-response team (example 36 FTEs at ~$55k each plus benefits). |
| Research Scientist | 6 | [#4] Senior neuroscientists / anomalous physicists required for monitoring and experiments. |
| EEG / Telemetry Technician | 6 | [#4, #5] Continuous telemetry and sensor operators for EEG/spectrum instrumentation. |
| Medical Officer / ICU Nurses | 8 | [#10, #11] On-site neurology/ICU staffing to handle exposed personnel and surgical interventions. |
| Engineer / Maintenance | 4 | [#2, #7, #29] Facilities, power and robotics maintenance staff for vault, generators and manipulator suites. |
| Administrative Staff | 3 | [#16, #21] Administrative, logistics and legal-support staff for operations, PSYOPS coordination and documentation. |
Confidence Notes
Mid confidence: analyst notes provide many explicit line items and ranges allowing a reasoned midpoint estimate, but wide ranges on major contingency items and uncertain incident frequencies produce moderate uncertainty.