SCP-3584
Euclid
~
medium confidence
SCP-3584
Expected annual
$1.9M
One-time setup
$10.1M
Annual recurring
$1.9M
Personnel
13
Initial capital is approximately $10,140,625 driven primarily by greenhouse construction, deep root containment, specialized equipment (HVAC, monitoring, incinerator) and a contingency fund. Recurring operating costs are estimated at $1,871,000/year, driven by staff wages, utilities (HVAC power), insurance, and ongoing research/monitoring.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with no significant incidents; all systems operating within expected parameters.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$2.0M/yr
Localized containment incident requiring emergency response, repairs, temporary increased staffing and PR/legal activity.
localized_structural_damage
small_release_or_seed_escape
localized_memetic_exposure
🚨
Major Breach
$5.4M/yr
Major structural failure, significant release or large-scale contamination requiring re-containment, major repairs and remediation.
structural_collapse
large_scale_release
extensive_environmental_remediation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] Six guards for 24/7 coverage (two per shift × three shifts); salary assumptions aggregated into staff_wages. |
| Research Scientist / Horticulturist | 2 | [#10] Two full-time plant scientists/horticulturists responsible for specimen care and research; salaries included in staff_wages. |
| Containment Technician / Maintenance | 5 | [#11] Four to six technicians estimated; five full-time-equivalent used to match staff_wages (pruning, repairs, irrigation maintenance, emergency response). |
Confidence Notes
Estimates are mid-range approximations from broad ranges provided by the analyst notes. Major uncertainties remain around required engineering (root forces/depth), HVAC energy use, and scale of memetic safety systems, so confidence is medium.