SCP-3586
Euclid
~
medium confidence
SCP-3586
Expected annual
$703K
One-time setup
$818K
Annual recurring
$696K
Personnel
4.25
Initial capital of approximately $818,000 for pressure-rated containment, equipment, and a contingency reserve; main recurring drivers are staff wages (technician, guards, chef, vet), chef & food costs, and emergency/retainer logistics totaling ~$696k/yr.
One-Time Capital Costs
Total: $818K
Annual Recurring Costs
Total: $696K/yr
Cost Scenarios
📊
Baseline
(baseline)
$696K/yr
Normal year with routine feeding, maintenance, and no major incidents.
routine_operations
no_escape_or_large_duplication
🚨
Minor Incident
$707K/yr
Small unexpected duplication surge requiring extra capture, veterinary checks, and minor public liaison.
small_duplication_surge
additional_capture_and_testing
🚨
Major Breach
$831K/yr
Containment breach or larger-than-normal replication event requiring multi-day recovery operations and facility repairs.
escape_from_chamber
multiple_public_sightings
facility_damage
🚨
Catastrophic Replication Event
$1.3M/yr
Mass replication and/or overpressure damage leading to large-scale capture campaigns, public exposure management, and major facility replacement.
mass_replication
large_scale_public_exposure
facility_overpressure_damage
Personnel
4.25 total
| Role | Count | Notes |
|---|---|---|
| Avian Technician / Caretaker | 1 | [#5] One dedicated full-time technician responsible for daily feeding, tagging, cleaning, and monitoring. |
| Security Officer / MTF Agent | 2 | [#6] Two on-site guards to provide continuous coverage and respond to containment alarms. |
| Part-time Veterinarian / Consultant | 0.25 | [#7] Part-time contracted veterinary support (retainer/hours equivalent). |
| Private Chef (retainer) | 1 | [#8] One contracted/high-quality private chef retained to meet meal reputation requirements. |
Confidence Notes
Line items are grounded in practical engineering and operational estimates, but ranges for replication frequency, chef/food policy choices, and incident severity create material uncertainty in annual costs.