SCP-359
Euclid
~
medium confidence
SCP-359
Expected annual
$7.3M
One-time setup
$16.1M
Annual recurring
$6.8M
Personnel
50
Initial capital investment is substantial (~$16.1M) driven by site construction, heavy equipment, and contingency funds; ongoing operations are the primary annual cost driver (~$6.81M/yr) led by AMTF staffing, research staff, and excavation/transport operations.
One-Time Capital Costs
Total: $16.1M
Annual Recurring Costs
Total: $6.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.8M/yr
Normal year with routine operations, monitoring, scheduled training and no major incidents.
routine_surveillance
scheduled_training
periodic_GPR_readings
🚨
Minor Incident
$7.1M/yr
Localized breach or injury requiring emergency response, limited equipment replacement and cleanup.
small_breach
medical_evacuations
equipment_damage
🚨
Major Breach
$9.3M/yr
Significant containment breach or attack causing major equipment loss, site repairs, extended operations, and use of incident fund.
major_breach
multiple_casualties
extensive_infrastructure_damage
🚨
Research Breakthrough Requiring Scale Up
$11.8M/yr
Decision to escalate research access: full-scale excavation/campaign or major procurement to access SCP-359-A or harvest hephaesium in earnest.
successful_neutralization_plan
approved_excavation_campaign
large_scale_procurement
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#5] AMTF Gamma-27 tactical contingent stationed on-site (rotational staffing to maintain 24/7 coverage). |
| Research Scientist | 8 | [#15] Metallurgists, geophysicists, structural engineers and data scientists assigned to characterization and monitoring tasks. |
| Security Guard / Contract Guard | 9 | [#6] Local/contracted security personnel to staff static posts and manage civilian interactions. |
| Medical Officer | 1 | [#16] On-site medic for immediate casualty care and Hazmat response. |
| Engineer / Maintenance | 2 | [#3, #18] Technical staff for generator/vehicle maintenance, equipment upkeep and logistics support. |
Confidence Notes
Line-item ranges were provided in analyst notes allowing mid-range estimates, but uncertainty remains around frequency of excavation campaigns, likelihood of major breaches, and whether high-cost neutralization will be attempted; probabilities and some annualized figures are therefore estimates.