SCP-3606
Euclid
✓
high confidence
SCP-3606
Expected annual
$1.3M
One-time setup
$785K
Annual recurring
$1.3M
Personnel
11
[#29] One-time setup costs are approximately $785,000 driven by property purchase, structural works (stair/tunnel, garage) and specialized equipment; annual recurring operations are approximately $1,299,700/year driven primarily by livestock procurement (~$220k/yr) and on-site security/payroll (~$398k/yr).
One-Time Capital Costs
Total: $785K
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with containment procedures in place and no major incidents.
routine_operations
scheduled_deliveries
no_breach_or_exposure
🚨
Minor Incident
$1.3M/yr
Small containment incident requiring extra medical retrievals, localized biohazard cleanup and modest legal/PR work.
single_human_exposure
localized_public_discovery
equipment_failure_requiring_cleanup
🚨
Major Breach
$1.6M/yr
Significant public exposure or multiple human casualties requiring extended emergency response, legal settlements and substantial PR/cover operations.
media_exposure
multiple_casualties
local_authority_involvement
🚨
Catastrophic Breach
$3.3M/yr
Major containment failure leading to widespread exposure, site rebuild/relocation, large settlements and long-term research/containment escalation.
mass_media_exposure
mass_casualties
containment_failure_needing_relocation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] Six rotating on-site security guards (part of the security payroll estimate). |
| Security Supervisor | 1 | [#10] On-site security supervisor (included in security payroll). |
| Research Scientist | 2 | [#16] Two salaried research scientists (part of research payroll). |
| Lab Technician | 1 | [#16] One laboratory technician/assistant (included in research payroll). |
| Footage Reviewer / Analyst | 1 | [#9] Weekly footage reviewer (~4 hrs/week) whose wages are included in staff_wages. |
Confidence Notes
Analyst notes provide explicit line-item estimates for nearly all costs (procurement frequency, staffing, capital items). Values are reasonable market approximations for NJ and operations; uncertainty remains for rare catastrophic events but baseline numbers are well-specified.