SCP-3607
Euclid
~
medium confidence
SCP-3607
Expected annual
$2.0M
One-time setup
$1.9M
Annual recurring
$1.9M
Personnel
12
Initial setup is moderate-to-high due to property acquisition, security hardening, and specialized sensors/robotics (approx. $1.9M one-time). Ongoing annual costs are dominated by staff wages, research/R&D and contingency reserves, totaling roughly $1.95M/yr.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal operational year with steady monitoring, routine retrievals and no major incidents.
routine_monitoring
periodic_remote_retrievals
no_breaches
🚨
Minor Incident
$2.1M/yr
Localized anomaly escalation requiring extra retrievals, increased drone losses, overtime pay, and small legal/PR activity.
increased_anomalous_activity
multiple_remote_retrievals
equipment_attrition
🚨
Major Breach
$3.4M/yr
Significant containment breach or escalatory research effort requiring evacuation, heavy equipment mobilization, large-scale replacement and legal containment operations.
breach_with_civilian_exposure
large_scale_research_push
major_equipment_loss
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#4] Two covert security officers on-site at all times per containment procedures (present headcount). |
| Security Supervisor / Site Manager | 1 | [#5] Senior staff to coordinate site operations and oversee covert presentation (on-site/onsite-adjacent). |
| Research Scientist | 3 | [#15] Level 4+ researchers and postdocs/analysts overseeing anomaly monitoring and experiments (on-duty rostered team). |
| Field Technician / Robotic Operator | 2 | [#16, #9] Technicians to operate drones/robots, maintain sensors and perform scheduled checks. |
| Emergency Rapid-Response Team (on-call) | 2 | [#17] Rapid-response personnel/MTF assets on call for breach contingencies (not necessarily on-site but considered part of staffing complement). |
| Administrative Staff | 1 | [#28] Program admin and classified procurement/accounting support. |
| Engineer / Maintenance | 1 | [#13, #11] Technical maintenance support for power systems, locks and site infrastructure. |
Confidence Notes
Estimates are based on analyst ranges in the notes and canonical containment procedures; many items (anomalous equipment attrition and escalation scope) are uncertain, producing medium confidence.