SCP-3610
Safe
~
medium confidence
SCP-3610
Expected annual
$5.4M
One-time setup
$35.2M
Annual recurring
$5.1M
Personnel
28
Up-front capital and setup are approximately $35.3M with major drivers being net materials and structural supports; ongoing annual costs are about $5.1M driven by net maintenance, staffing, amortized replacement reserve and administrative overhead.
One-Time Capital Costs
Total: $35.2M
Annual Recurring Costs
Total: $5.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.1M/yr
Normal year with scheduled maintenance, routine repairs and no major incidents.
scheduled maintenance
minor repairs
routine operations
🚨
Minor Incident
$5.3M/yr
Localized net breaches or tower damage requiring expedited repairs and overtime.
localized storm damage
vandalism
net tear repairs
🚨
Major Storm Damage
$8.1M/yr
Typhoon or severe storm damages large sections of net and multiple towers, requiring large-scale replacement and emergency mobilization.
typhoon/major storm
multiple structural failures
large-scale net replacement
🚨
Political Exposure
$6.6M/yr
Local discovery or political/legal pressure requiring buyouts, increased legal defense and PR/cover adjustments.
local investigation
media attention
permit/legal disputes
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#15] 24/7 gate and patrol coverage; rotational shifts and supervisors reflected in security wage budget. |
| Engineer / Maintenance | 6 | [#16] Maintenance technicians, rigging crew, welders and crane operators for repairs and tower/net upkeep. |
| Research Scientist | 4 | [#17] Scientific/oversight staff to monitor SCP-3610-1, conduct sampling and manage logs/databases. |
Confidence Notes
Estimates are engineering-and-logistics based with clear major drivers (netting area, towers, maintenance). Uncertainty remains due to local contract variability, typhoon risk, and cover/land-access costs which produce a mid-level confidence.