SCP-3620
Safe
✓
high confidence
SCP-3620
Expected annual
$58K
One-time setup
$58K
Annual recurring
$55K
Personnel
0.45
One-time capital and initial research costs are moderate (~$57.6k) driven by a custom airtight enclosure and instrumentation; recurring annual costs (~$55.3k/yr) are dominated by staff wages and ongoing analytical monitoring and maintenance.
One-Time Capital Costs
Total: $58K
Annual Recurring Costs
Total: $55K/yr
Cost Scenarios
📊
Baseline
(baseline)
$55K/yr
Normal uneventful year with routine maintenance, testing, and operations.
routine_operations
scheduled_testing
regular_maintenance
🚨
Minor Incident
$63K/yr
Localized equipment failure or small containment/monitoring fault requiring emergency repair, expedited calibration, and extra testing/overtime.
sensor_or_dispenser_failure
small_seal_leak_or_service_need
unexpected_increase_in_headache_reports
🚨
Major Breach
$95K/yr
Serious containment failure or anomalous behavior requiring emergency relocation, substantial repairs/rebuild, large-scale testing, and extended incident response.
catastrophic_equipment_failure
major_unexpected_mass_anomaly
widespread_medical_incidents
🚨
Research Breakthrough Requiring Scale Up
$75K/yr
Opportunity-driven scenario where research expands (frequent sample removals, larger assays, or scale-up experiments) increasing consumable and testing costs significantly.
novel_finding
grant-funded_scale_up
systematic_mass-removal_experiments
Personnel
0.45 total
| Role | Count | Notes |
|---|---|---|
| Animal-care Technician | 0.25 | [#9] ≈0.25 FTE dedicated to daily cleaning, measurement, feeding and logging (salary+benefits included in staff_wages). |
| Research Scientist | 0.1 | [#10] Part-time oversight (≈0.05–0.15 FTE; midpoint used) for experiment approval and protocol oversight. |
| Security Officer / Access Administrator | 0.1 | [#11] Minimal security/badge-control duties allocated (shared coverage; salary portion included in staff_wages). |
Confidence Notes
Analyst notes provide explicit line-item ranges and clear containment requirements; estimates use midpoints and standard lab procurement assumptions. Remaining uncertainty is fabrication choices and frequency of exceptional incidents.