SCP-3621
Safe
~
medium confidence
SCP-3621
Expected annual
$3.7M
One-time setup
$32.9M
Annual recurring
$3.5M
Personnel
11
First-year capital (one-time) is dominated by procurement of a Scranton Reality Anchor and contingency reserve (~$32.9M total one-time); annual operations are dominated by staff, continuous power and site-wide lost-productivity costs (~$3.456M/yr baseline).
One-Time Capital Costs
Total: $32.9M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal operational year with no major incidents; routine maintenance, staffing, power and monitoring costs only.
no SRA failures
no emergence-driven containment events
routine maintenance only
🚨
Minor Incident
$5.0M/yr
Localized SRA anomaly or Hume fluctuation requiring emergency response, equipment repairs and partial replacement of spares; short-term productivity losses.
SRA glitch
small containment breach
emergence event causing limited spread
🚨
Major Breach
$13.5M/yr
Significant SRA failure or prolonged Hume disturbance requiring full SRA replacement, large remediation and extended downtime for parts of Site-04.
SRA catastrophic failure
multiple containment failures
extended remediation
🚨
Catastrophic Breach
$28.5M/yr
Worst-case trans-dimensional contamination or CK-level event triggered by SCP-3621 emergences or SRA failure requiring site expansion/decommissioning and multi-million remediation.
SRA fails during major emergence
large-scale trans-dimensional contamination
site-wide decommissioning/major remediation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#9] 24/7 armed guard coverage, rotating shifts and supervisors; wage assumptions included in staff_wages. |
| Engineer / Maintenance | 3 | [#10, #4] Specialist engineers/technicians for SRA maintenance, installation support and monitoring (on-call and scheduled). |
| Research Scientist | 1 | [#10, #26] Senior scientist to interpret Hume logs, lead mitigation R&D and oversee calibration programs. |
| Site Director / Executive Staff | 1 | [#11, #21] Site-level management and approval coordination for O5/administrative liaisons (included pro-rata in staff_wages/site overhead). |
Confidence Notes
Analyst notes provide detailed line items and ranges, but the largest single drivers (SRA capital cost and long-run productivity loss) have very wide ranges and high uncertainty; therefore confidence is medium.