SCP-3626
Keter
~
medium confidence
SCP-3626
Expected annual
$15.3M
One-time setup
$16.0M
Annual recurring
$15.1M
Personnel
25
One-time capital for hardened, air-gapped containment and safe-viewing hardware is moderate (~$16.0M total one-time including a large emergency reserve); recurring annual operations are driven by specialized staff, global takedown/cooperation, monitoring, logistics and legal/cover operations (~$15.1M/yr baseline).
One-Time Capital Costs
Total: $16.0M
Annual Recurring Costs
Total: $15.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.1M/yr
Normal year with no major incidents; ongoing containment, monitoring, staffing and cooperation operate at steady-state.
no_significant_leak
routine_operations
standard_monitoring
🚨
Minor Incident
$15.6M/yr
Localized leak or small public exposure requiring targeted takedowns, additional amnestics, overtime, and limited legal/PR response.
localized_leak
limited_public_exposure
single-site_breach
🚨
Major Breach
$25.1M/yr
Widespread leak requiring international takedowns, mass amnestic deployment, emergency legal settlements and major field operations.
widespread_online_proliferation
international_exposure
mass_casualty_or_settlements
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#4] Senior memetics researchers (high-clearance) as described in analyst notes; salaries included in staff_wages. |
| Research Technician | 4 | [#4] Research assistants/technicians supporting memetics work; salaries included in staff_wages. |
| Security Officer / MTF Agent | 8 | [#5] Dedicated onsite security personnel enforcing two-person rule and escort duties; salaries included in staff_wages. |
| MTF / Mobile Response Agent | 6 | [#6] Mobile response/tactical retrieval personnel; partial salary allocation included in staff_wages, with operational costs in mobile_response. |
| Incident Forensic / IT Response | 4 | [#7] Forensic & IT response specialists responsible for detection, signatures and network removal; salaries included in staff_wages. |
Confidence Notes
Analyst notes provide detailed cost ranges for most line items, but many figures are wide ranges and several items (reserves, large-scale incidents, long-term research) are speculative. Estimates use midpoints and allocation assumptions; therefore confidence is medium.