SCP-3627
Euclid
~
medium confidence
SCP-3627
Expected annual
$562K
One-time setup
$115K
Annual recurring
$555K
Personnel
6
Initial one-time setup is modest (~$115k) dominated by containment retrofit and a contingency reserve; recurring annual costs are driven primarily by personnel salaries and research/monitoring programs (~$555k/year).
One-Time Capital Costs
Total: $115K
Annual Recurring Costs
Total: $555K/yr
Cost Scenarios
📊
Baseline
(baseline)
$555K/yr
Normal operational year with routine testing cadence and no major incidents.
routine_tests
no breaches
standard staffing
🚨
Minor Incident
$580K/yr
Small-scale incident (medical/psych event or limited equipment failure) requiring extra counseling, overtime, and minor repairs.
medical emergency
equipment repair
additional counseling
🚨
Major Breach
$805K/yr
Significant containment event or hostile breach triggered by personnel attempting unauthorized access, requiring recovery, legal/amnestic response, and containment refit.
unauthorized access attempt
containment breach
public exposure
🚨
Research Breakthrough Requiring Scale Up
$755K/yr
Decision to scale experimental program (clinical trials or therapeutic rollout) requiring significant one-time program funding and expanded staffing.
positive therapeutic results
approved clinical program
expanded trial cohort
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | 2 guards assigned part-time to the wing (~0.5 FTE combined) per analyst note [#5]. |
| Containment Technician | 1 | Dedicated containment/custodial technician to perform daily checks and handle insertions [#6]. |
| Research Scientist | 2 | 1 research lead and 1 assistant (anomalous research staff Level 3+) [#7]. |
| Administrative Staff | 1 | Part-time admin support (0.5 FTE) for recordkeeping and chain-of-custody [#9]. |
Confidence Notes
Containment and operational requirements are well-documented in analyst notes (medium confidence); many line items have wide estimate ranges or optional program choices (specialized testing, in-house instrument purchases), producing moderate uncertainty.