SCP-3694
Keter
~
medium confidence
SCP-3694
Expected annual
$6.5M
One-time setup
$16.3M
Annual recurring
$6.2M
Personnel
18
One-time setup costs are large (~$16.3M) driven by containment construction, a multi-program research buildout, and a contingency/reserve allocation; annual operating costs are significant (~$6.2M/yr) dominated by staff wages, ongoing research/monitoring, legal/PR/insurance, and preparedness reserves.
One-Time Capital Costs
Total: $16.3M
Annual Recurring Costs
Total: $6.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.2M/yr
Normal year with routine inspections, maintenance, and no major public incidents.
no confirmed public outbreaks
routine research and maintenance
annual training and inspections
🚨
Minor Incident
$6.7M/yr
Single confirmed public instance requiring an MTF deployment, amnesticization, localized repairs and legal/PR response.
local Denny's instance discovered
single MTF deployment and localized infrastructure repair
targeted PR/legal settlements
🚨
Major Breach
$16.2M/yr
Large multi-instance outbreak or public cluster requiring mass evacuations, major sewer replacement, large amnestic campaigns and full contingency activation.
multiple simultaneous public instances
major municipal infrastructure damage
widespread exposure requiring mass amnestics and legal action
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Containment Lead / Site Director | 1 | Senior lead responsible for on-site containment and research oversight (mapped to #6). |
| Research Scientist | 2 | Senior researchers conducting botanical/chemical research and trials (mapped to #6, #17). |
| Technician / Lab Technician | 4 | Technical staff for lab maintenance, sample handling and experiments (mapped to #6, #22). |
| Security Officer / MTF Agent | 7 | On-site guards and security to enforce access restrictions and support containment (mapped to #6). |
| Administrative Staff | 2 | Administrative and archival staff for records, access control and coordination (mapped to #9, #28). |
| Medical Officer | 1 | Medical support for exposure treatment, amnestic administration and follow-up monitoring (mapped to #10, #23). |
| Engineer / Maintenance | 1 | Facility/HVAC/vehicle maintenance and engineering support (mapped to #1, #2, #16). |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing a reasoned cost model, but many estimates require program-level assumptions (number of vehicles, spectrum of incidents, chosen reserve size and R&D scale). Uncertainty remains in incident frequency and scale of legal/municipal expenses, so confidence is medium.