SCP-3695
Safe
~
medium confidence
SCP-3695
Expected annual
$519K
One-time setup
$460K
Annual recurring
$501K
Personnel
3.5
One-time setup (hardware, ROV purchase, lab/monitoring setup, and contingency reserves) totals roughly $460k; recurring annual costs for a retained local response team, monitoring, insurance and logistics are about $501k/year, with the main drivers being maritime rapid-response retainer, staff wages, and monitoring/repair costs.
One-Time Capital Costs
Total: $460K
Annual Recurring Costs
Total: $501K/yr
Cost Scenarios
📊
Baseline
(baseline)
$501K/yr
Normal year with retained local response, routine monitoring, minor consumables and no major loss events.
no_loss_event
routine_maintenance
scheduled_training
🚨
Minor Incident
$521K/yr
SCP-3695 becomes untethered but is recovered via local retainer/charter, small salvage team or short ROV/diver deployment.
short_range_drift
one-day_charter
local_ROV_or_salvor
🚨
Major Recovery
$651K/yr
Longer-range offshore salvage requiring multi-day charter or research-vessel support with ROV and contractor fees.
long_range_drift
research_vessel_deployment
paid_salvage_contract
🚨
Catastrophic Deep Sea Retrieval
$1.1M/yr
SCP-3695 drifts into pelagic/deep-sea zone requiring an expeditionary research vessel, deep-sea ROV/saturation teams and major salvage effort.
pelagic_transfer
deep_sea_expédition
multi-day_ROV_and_research_vessel
Personnel
3.5 total
| Role | Count | Notes |
|---|---|---|
| Boat Operator | 1 | [#13] Local boat operator for retrievals and retained response. |
| ROV / Diver Technician | 1 | [#9, #13] Technician/operators for ROV and diver-led recoveries (training and maintenance covered in recurring costs). |
| Research Scientist | 1 | [#11, #12, #13] Marine scientist conducting modelling, experiments and overseeing containment. |
| Watch / Scheduler (FTE) | 0.5 | [#13] Part-time monitoring/watch role (0.5 FTE) to manage trackers, retainer coordination and scheduling. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a mid-confidence estimate; however many items have wide ranges (salvage/expedition, buoy deployment) so uncertainty remains in contingency sizing and scenario frequencies.