SCP-3701
Safe
~
medium confidence
SCP-3701
Expected annual
$2.6M
One-time setup
$5.0M
Annual recurring
$2.5M
Personnel
15
Estimated one-time containment/setup costs are approximately $5.04M driven by dedicated vault construction, testing chamber, contingency reserve and specialized equipment; recurring annual costs are about $2.54M driven by staff wages, ongoing research/monitoring, legal/cover-up expenses and site overhead.
One-Time Capital Costs
Total: $5.0M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Routine year with scheduled tests, regular maintenance, and no major incidents.
scheduled_testing
routine_maintenance
no_incidents
🚨
Minor Incident
$2.7M/yr
Small containment/health incident (isolated subject adverse event or minor equipment damage) requiring local medical response, limited repairs and modest legal/cover-up actions.
single_subject_adverse_event
minor_equipment_damage
small_legal_action
🚨
Major Incident
$4.2M/yr
Significant breach/incident causing multiple casualties or loss of equipment requiring large medical response, investigation, major repairs and partial contingency replenishment.
multi-subject_casualty
major_equipment_loss
legal_exposure
🚨
Catastrophic Breach
$52.5M/yr
An XK-class or site-level destructive outcome (e.g., large-scale environmental/temporal disaster) requiring full emergency response, site recovery, O5-level interventions and large-scale remediation/cover-up.
site_destruction
XK-class_outcome
mass_casualties
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level 4) | 1 | [#9] Senior researcher required to authorize tests and oversee research. |
| Research Technician | 3 | [#9, #11] Technical staff to run experiments, maintain instrumentation and collect data. |
| Security Officer / MTF Agent | 8 | [#10] Dedicated security staff to provide round-the-clock site coverage and rapid response. |
| Medical Officer | 1 | [#7] On-call physician coverage for pre/post-test screening and emergency care. |
| Nurse | 2 | [#7] Part-time/on-call nursing staff to support medical screening and immediate post-return monitoring. |
Confidence Notes
Line-item cost ranges are reasonably well-defined for construction, equipment and staffing, but uncertainty remains due to unknown testing tempo (subjects/year), potential for high-cost anomalous incidents and judgement calls on site-overhead allocation.