SCP-375
Euclid
~
medium confidence
SCP-375
Expected annual
$8.5M
One-time setup
$9.9M
Annual recurring
$8.5M
Personnel
33
Estimated one-time capital expenditure is approximately $9.86M to acquire and harden a former mall into Site 375; recurring annual operating costs are approximately $8.46M/yr driven primarily by research programs, staff wages/benefits, D-Class upkeep, and contingency/reserve funds.
One-Time Capital Costs
Total: $9.9M
Annual Recurring Costs
Total: $8.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.5M/yr
Normal, uneventful year with standard testing, maintenance, and research activity but no containment incidents.
routine_operations
scheduled_research
no_breaches
🚨
Minor Incident
$9.0M/yr
Localized containment incident requiring decontamination, temporary repairs, overtime, and modest replacement of equipment or archival materials.
localized_breach
small-scale_decontamination
temporary_repair_and_overtime
🚨
Major Breach
$12.0M/yr
Significant containment breach or public exposure event requiring major repairs, replacement of vaults/equipment, extended medical care, external contractors, and extensive cover operations.
major_containment_failure
public_exposure
multi-unit_decontamination
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Senior Research Lead | 1 | [#8] Senior salary and special-grade allowances for site oversight and liaison. |
| Research Scientist | 6 | [#9] Scientific staff (chemists/physicists/anthropologists/field researchers) assumed as ~6 FTEs for continuous study and testing. |
| Security Officer / MTF Agent | 14 | [#10] Onsite armed security and tactical response (12–16 FTE modeled as 14 for continuous coverage and rapid response). |
| Medical Officer / Nurse / Psychiatric Support | 3 | [#11] Onsite medical and psychiatric coverage (2–3 FTE modeled as 3). |
| Engineer / Maintenance / IT / Administrative Staff | 9 | [#12] Support staff for daily operations: HVAC/engineer, IT admin for secure networks, custodial and administrative personnel. |
Confidence Notes
Estimates are based on analyst-provided ranges and reasonable mid-point assumptions; line items and contingencies are explicit. Uncertainty remains in frequency and severity of anomalous incidents, scale of long-term research programs, and future equipment needs, so confidence is medium.