SCP-376
Safe
~
medium confidence
SCP-376
Expected annual
$700K
One-time setup
$2.3M
Annual recurring
$650K
Personnel
5
Initial capital and one-time set-asides are the dominant up-front expense (~$2.29M) driven by a large contingency reserve and optional grid-monitoring/upgrades; recurring annual costs are moderate (~$650.5k/year) driven by research staffing, fuel/power, maintenance, and institutional overhead.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $650K/yr
Cost Scenarios
📊
Baseline
(baseline)
$650K/yr
Normal uneventful year with routine maintenance, research, and operations only.
no grid tie beyond containment
routine inspections and trimming
expected research activities
🚨
Minor Incident
$700K/yr
Localized root breach or small unexpected growth event requiring urgent repairs, extra disposal, and overtime.
root breach into non-critical infrastructure
localized seedling appearance nearby
minor emergency repairs and extra disposal
🚨
Major Breach
$1.3M/yr
Specimen ties into external grid or spawns multiple nearby instances requiring coordinated utility outages, large-scale eradication, and potential compensation.
external grid tie detected
multiple propagated seedlings in public areas
utility-coordinated outages and remediation
🚨
Catastrophic Breach
$3.0M/yr
Widespread propagation through the grid requiring multi-jurisdictional eradication, deployment of large contingency funds, and possible long-term remediation.
widespread grid-mediated propagation
multiple urban instances requiring public-safety response
nation-scale mitigation efforts
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Technician | 2 | [#13] Small research team (1–2 scientists/technicians) funded within the research budget. |
| Horticulture / Arborist | 1 | [#7] Primary on-site technician responsible for trimming and daily care (1 FTE equivalent). |
| Engineer / Maintenance (Electrician) | 1 | [#6, #12] Electrical inspections and maintenance coverage (quarterly inspections and occasional repairs; contractor-equivalent staffing allocated). |
| Administrative Staff / Legal / PR (allocated) | 1 | [#16, #22] Administrative/legal/PR support and facility overhead allocations for cover story management and coordination. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a medium-confidence estimate; large optional items and wide ranges (contingency, grid program, power strategy) limit higher confidence.