SCP-3828
Keter
~
medium confidence
SCP-3828
Expected annual
$53.7M
One-time setup
$222.6M
Annual recurring
$53.4M
Personnel
36
Initial capital costs are dominated by the potential purchase/refit of an icebreaker and site retrofits; recurring costs are driven by continuous vessel operations, crew/payroll, secure storage operations, research, and long-term sustainment reserves.
One-Time Capital Costs
Total: $222.6M
Annual Recurring Costs
Total: $53.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$53.4M/yr
Normal operational year with continuous chartered vessel operations, routine research, and standing contingency funding; no major incidents.
continuous field operations
routine maintenance
scheduled research projects
🚨
Minor Incident
$53.9M/yr
Localized incident requiring medevac, emergency retrievals, short-term remediation and increased legal/cover activity.
single medevac / emergency salvage
small media exposure requiring PR/legal response
🚨
Major Breach
$72.9M/yr
Significant containment breach or large environmental remediation event requiring large-scale contractors, replacement assets, and heavy remediation.
facility breach involving heavy anomalous material
major environmental remediation or asset loss
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Ship Crew (captain/officers/engineers/deckhands) | 12 | [#2] Merchant/military-level vessel crew for polar operations and vessel operation. |
| Research Scientist | 6 | [#2, #18] Biologists/materials scientists running projects and cover research. |
| ROV / Technical Operators | 4 | [#3, #4, #5] Hermit-1 operators, tether/cable technicians, monitoring operators. |
| Security Officer / MTF Agent | 8 | [#2, #14] Armed guards and rapid-response security for site and on-board operations. |
| Medical Officer / Veterinary | 1 | [#17] Onboard veterinary care and periodic medical support for SCP-3828 and crew. |
| Engineer / Maintenance | 3 | [#10, #6] Crane/rigging and shipboard/containment maintenance specialists. |
| IT / Cybersecurity Staff | 1 | [#23] Secure IT, air-gapped backups and monitoring. |
| Archive / Administrative Staff | 1 | [#27] Cataloguing, chain-of-custody records, and administrative support. |
Confidence Notes
Analyst notes provide detailed line-item ranges permitting mid-range point estimates, but wide ranges for vessel options, incident severity and long-term liabilities introduce material uncertainty; assumptions (charter vs purchase, incident frequency) drive major variance.