SCP-3829
Euclid
?
low confidence
SCP-3829
Expected annual
$15.7M
One-time setup
$169.5M
Annual recurring
$12.9M
Personnel
41
Initial capital costs are dominated by purpose-built reinforced vaults, research lab buildout and speculative extradimensional R&D (~$170M one-time). Recurring annual costs are driven by specialized staff wages, ongoing temporal research, BSL-4 operations, cryostorage and security (~$12.9M/yr).
One-Time Capital Costs
Total: $169.5M
Annual Recurring Costs
Total: $12.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.9M/yr
Normal year with scheduled procedures, staffing, monitoring, and routine R&D with no major incidents.
steady-state containment
weekly excisions and cryostorage
ongoing research and maintenance
🚨
Minor Incident
$20.1M/yr
Localized breach/event requiring field response, targeted decontamination, limited recovery and cover-up operations.
tumor ejection causing localized structural damage
field retrieval of samples
targeted decontamination and cover-up
🚨
Major Breach
$122.9M/yr
Catastrophic containment failure resulting in site destruction or requirement to rebuild/replace major facilities and large-scale recovery/cover-up.
full-site destabilization and collapse
multiple SCP escapes or theft
requirement to reconstruct or replace Site-172-equivalent infrastructure
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Medical Officer / On-site Medical Core | 5 | [#10] On-site oncologists, anesthesiologists and surgical techs for weekly procedures. |
| Containment Technician / Robotics Operator / Cryo-Tech | 8 | [#11] Operators to run robotics, handle samples and maintain cryogenic storage. |
| Security Officer / MTF Agent | 15 | [#12] Armed guards and rapid response personnel for continuous security. |
| Research Scientist | 9 | [#13] Biologists, molecular researchers and temporal physicists for containment and neutralization research. |
| Site Director / Management & Compliance | 4 | [#14] Site management, compliance, legal liaison and HR for classified operations. |
Confidence Notes
While many line-item ranges were provided, the anomalous temporal/retrocausal behavior and speculative extradimensional R&D create high uncertainty in capital and recurring needs; estimates rely on broad midpoints and expert judgment rather than definitive bids.