SCP-3833 Geographical ~ medium confidence
SCP-3833
Expected annual
$28.3M
One-time setup
$172.1M
Annual recurring
$27.6M
Personnel
45
Initial capital to build and outfit Site-3833 is large (primarily underground construction and specialized equipment) while annual operating costs are driven by hazardous-location staffing, aircraft operations, and logistics; estimated one-time capital ~$172M and recurring ~$27.6M/yr.
🏗️ One-Time Capital Costs Total: $172.1M
Facilities $120.0M
[#1] Construction of Site-3833 subterranean facility: excavation/boring or cut-and-cover, pressurized hab modules, labs, storage, decontamination, elevator/shaft access, anchoring, blast-proofing and high-altitude construction premiums.
Equipment $21.4M
[#3, #5, #7, #8, #19] Major hardware purchases: purchase of 1–2 medium/heavy helicopters (capital option), generator/battery/solar systems, weatherized sensor array (multi-band cameras, thermal imagers, LiDAR, seismic/EM sensors), hardened communications hardware and one-time data hardware purchases.
Access Infrastructure $10.0M
[#2] One-time construction/upgrade of access road, cable-way/cable car, helipad and material staging areas, fuel bladder setup and staging facilities.
Contingency Reserve $10.0M
[#24] One-time contingency/escalation reserve recommended for major unexpected events, large crash recovery, or rapid secondary site construction.
Cover Story Setup $3.0M
[#17] Initial legal/diplomatic/cover payments and agreements, initial covert PR and liaison setup to establish 'Weather Hazard' cover with local authorities.
Life Support Systems $3.0M
[#6] Pressurization systems, high-capacity HVAC/heating, oxygen systems and related installation for high-altitude life-support.
Initial Research And Lab Setup $2.0M
[#12, #25] Initial research lab buildout and anomalous-focused R&D: specialized instruments, mock-up cabins for experiments, anomalous-resistant gear R&D startup.
Redundancy Failover $1.2M
[#15] Cold spares, off-site data mirrors, secondary monitoring stations, redundant power and disaster recovery hardware.
Medical Equipment $550K
[#14] One-time purchase of on-site critical care equipment, portable hyperbaric/oxygen units, trauma gear.
Protective Equipment $350K
[#13] Initial purchase of cold-weather suits, insulated tents, climbing gear, EMP/RCIED-rated containers, hardened camera housings.
Environmental Compliance $300K
[#23] Initial environmental assessments and remediation planning, initial community compensation programs.
D Class Holding $200K
[#11] One-time secure D-class holding and secure staging buildout for testing program.
🔄 Annual Recurring Costs Total: $27.6M/yr
Staff Wages $9.0M/yr
[#9] Core on-site staffing salaries for a stable complement of personnel (site director, operations officers, technicians/engineers, medics, logistics, communications, admin) with high-altitude hazard pay and remote-post premiums.
Aircraft Operations $5.0M/yr
[#4] Fuel, maintenance, hangaring, pilot salaries, high-altitude operational costs for 1–2 aircraft (includes medevac and material lift ops).
Security Personnel $2.2M/yr
[#10] Salaries for rotating guards (20 personnel at $80k–$120k/yr) plus training/equipment budgets.
Contingency Reserve $2.0M/yr
[#24] Annual contingency allocation to cover unexpected equipment failure, extended entrapments, or escalation events.
Crash Response Fund $1.5M/yr
[#16] Annual reserve for aircraft crash response, salvage, decontamination, heavy-lift contracts and investigations.
Research And Monitoring $1.2M/yr
[#12] Annual experimental budgets, after-action analyses, staff scientists, external collaborators, travel, and lab consumables for studying SCP-3833 phenomena.
Cover Story And Legal $1.0M/yr
[#17] Ongoing legal retainers, covert payments, diplomatic liaison fees and cover-story maintenance under 'Weather Hazard'.
Supplies And Consumables $650K/yr
[#20] Food, water purification, spare parts, replacement electronics, fuels and routine resupply logistics at altitude.
Anomalous Research $600K/yr
[#25] Ongoing R&D to harden gear, study SCP-3833-1/2/3 interactions, and maintain decoy/mock-up testing cabins.
Access Maintenance $500K/yr
[#2] Annual maintenance of access roads, cable-way upkeep, helipad and fueling logistics in severe weather.
Fuel And Power Maintenance $500K/yr
[#5] Fuel logistics, generator/battery maintenance, and power systems upkeep.
Medical Contracts $500K/yr
[#14] Ongoing med supplies, training, hospital/evacuation contracts and aeromedical readiness.
No Fly Zone Enforcement $500K/yr
[#18] Costs for airspace policing done covertly or via partnered enforcement (radar sweeps, interceptions, contracted patrols).
Life Support Consumables $400K/yr
[#6] Consumables and maintenance for pressurization systems, oxygen refills, HVAC upkeep.
Data Storage $300K/yr
[#19] Secure encrypted storage, analysts, archive redundancy and high-bandwidth data handling.
Training And Rotation $300K/yr
[#21] High-altitude survival, mountaineering, medical training, emergency drills, and rotation logistics.
D Class Operations $275K/yr
[#11] Recurring costs of D-class procurement/management, transport, medical monitoring, secure testing runs and legal/cover costs.
Facilities Maintenance $250K/yr
[#1] Ongoing structural, HVAC and facility maintenance for subterranean site-3833 (routine repairs, seasonal de-icing/structural checks).
Sensor Maintenance $250K/yr
[#7] Data links, storage, calibration, replacement and upkeep for weatherized sensor array and long-range tracking.
Redundancy Maintenance $200K/yr
[#15] Maintenance of off-site mirrors, cold spares, secondary stations and failover systems.
Psychological Care $150K/yr
[#22] Counseling, R&R rotations, reintegration programs and turnover mitigation.
Protective Equipment Replacement $125K/yr
[#13] Annual replacement of climbing and cold-weather gear, EMP-hardened housings and other PPE replacement due to SCP-induced failures.
Comms Maintenance $100K/yr
[#8] Satellite bandwidth, encrypted link maintenance, HF/VHF backups and EMI hardening upkeep.
Environmental Compliance Maintenance $100K/yr
[#23] Ongoing remediation, environmental monitoring and community programs.
Logistics And Transport $0/yr
[]
Heavy Aircraft Lease $0/yr
[#3] Lease alternative for heavy-lift aircraft (~$2M–$6M/yr). Set to $0 here to reflect capital purchase option accounted in one-time equipment.
Cost Scenarios
📊 Baseline (baseline) $27.6M/yr
80.0% probability / year
Normal year with routine operations, scheduled research, and no major incidents.
routine_operations scheduled_research no_major_incidents
🚨 Minor Incident $28.4M/yr
15.0% probability / year +$750K vs baseline
Short-duration SCP-3833-1 event or equipment-failure incident requiring elevated repairs/overtime and emergency resupply.
equipment_failure short_SCP-3833-1_event supply_delay
🚨 Major Breach $32.6M/yr
3.0% probability / year +$5.0M vs baseline
Significant event such as a commercial aircraft crash or large equipment loss requiring salvage, legal response and major replacements.
commercial_aircraft_crash major_equipment_loss large_salvage_operation
🚨 Catastrophic Breach $47.6M/yr
2.0% probability / year +$20.0M vs baseline
Prolonged anomalous activity or cascading failures requiring large-scale emergency response, use of contingency reserves, and possible secondary-site construction.
prolonged_SCP-3833-1_duration multi-system_failure emergency_relocation_or_secondary_site
👥 Personnel 45 total
Role Count Notes
Site Director / Executive Staff 1 [#9] Single site director to manage operations and liaison with external authorities.
Operations Officer 4 [#9] Day-to-day operations coordinators and shift leads for 24/7 coverage.
Research Scientist 12 [#12, #25] Scientists running experiments, analysis and anomalous research projects.
Technician / Engineer 14 [#5, #6, #7, #19] Technical staff maintaining life-support, power, sensors, comms and mechanical systems.
Medical Officer 3 [#14] On-site medics for trauma, hypoxia care and aeromedical coordination.
Pilot / Flight Crew 2 [#3, #4] Pilots and aviation crew for site-owned aircraft operations (if purchased).
Logistics Specialist 3 [#2, #20] Specialists managing supply-chains, resupply scheduling and cargo operations.
Communications Specialist 1 [#8] Maintains secure comms and satellite links; handles EMI hardening and link redundancy.
Administrative Staff 5 [#9, #17] Administrative and liaison personnel handling personnel, legal coordination and cover-story logistics.
📋 Confidence Notes
Estimates are derived from analyst ranges and operational experience for high-altitude remote sites; significant uncertainty remains around event frequencies (crashes, prolonged anomalous activity), choice between leased vs purchased aircraft, and contingency sizing, so confidence is medium.
← SCP-3832 ↑ All SCPs SCP-3834 →