SCP-3873
Unknown
~
medium confidence
SCP-3873
Expected annual
$902K
One-time setup
$780K
Annual recurring
$870K
Personnel
4.95
One-time capital costs are approximately $780,000 driven by cell construction, HVAC/install and a potential reverse-engineering program; recurring annual costs are approximately $870k/year driven by staffing, contingency/reserve, cybernetics upkeep and administrative overhead.
One-Time Capital Costs
Total: $780K
Annual Recurring Costs
Total: $870K/yr
Cost Scenarios
📊
Baseline
(baseline)
$870K/yr
Routine year with no major incidents; only scheduled maintenance, staffing and research occur.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$990K/yr
Localized medical emergency or limited cybernetic failure requiring emergency veterinary care, Spare parts and contractor time.
medical_emergency
localized_cybernetic_failure
minor_escape_attempt
🚨
Major Breach
$1.6M/yr
Catastrophic containment breach or large-scale cybernetic failure requiring recapture, major repairs, legal exposure and reverse-engineering/neutralization program.
full_breach
catastrophic_cybernetic_failure
public_exposure
Personnel
4.95 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#11] Two dedicated FTE guards assigned to the cell (salary+benefits included in staff wages). |
| Animal Handler / Behaviorist | 2 | [#12] Two dedicated handlers for enrichment, training and supervised interactions (salary+benefits included). |
| Medical Officer / Veterinarian | 0.25 | [#13] Part-time veterinarian allocation (~0.2–0.3 FTE) plus technician time; costs included in staff wages. |
| Research Scientist | 0.5 | [#14] Fractional researcher effort (~0.5 FTE) for study of communication and cybernetics; costs in staff wages. |
| Engineer / Maintenance | 0.2 | [#15] Fractional cybernetics engineering support (~0.2 FTE) for diagnostics and maintenance; costs in staff wages. |
Confidence Notes
Estimates map directly to analyst line items and site assumptions but cybernetic unknowns (networking, rare parts), choice between buying imaging vs site fees, and potential for PoI-dependent costs introduce significant but bounded uncertainty.