SCP-3900
Euclid
~
medium confidence
SCP-3900
Expected annual
$2.5M
One-time setup
$5.6M
Annual recurring
$2.4M
Personnel
19
Initial setup is dominated by secure shielding, specialized equipment, and a contingency reserve, totaling roughly $5.6M one-time; ongoing operations are driven by salaries, network monitoring, legal/insurance and readiness, totaling about $2.38M per year.
One-Time Capital Costs
Total: $5.6M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal, uneventful year with routine research, maintenance, and readiness expenses only.
no uncontrolled activations
routine testing only
🚨
Minor Incident
$2.5M/yr
Single small uncontrolled activation or field response requiring localized deployment, temporary fencing, device destruction and community compensation.
rural/uncontrolled activation
single-incident public exposure
🚨
Major Urban Activation
$10.4M/yr
Large uncontrolled activation in a dense urban area requiring large-scale emergency response, litigation, mass compensation and long-term remediation.
activation in dense urban area
mass public exposure and litigation
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | 24/7 coverage across three shifts; mapped to security staffing estimates [#9]. |
| Security Supervisor | 1 | Oversees guard rota and incident coordination [#9]. |
| Research Scientist | 3 | Lead researchers studying infection mechanics and mitigation [#14]. |
| Lab Technician | 2 | Support testing, equipment operation and data collection [#14, #4]. |
| Emergency Response Technician / Field Agent | 4 | Rapid field response team for deployments and device isolation; salaries included in staff_wages [#10]. |
| Animal Handler | 2 | Required for testing activations and animal welfare during events [#11]. |
| Administrative Staff | 1 | Admin, records and liaison work for permits and coordination [#8, #16]. |
Confidence Notes
Line items are well enumerated, allowing a medium-confidence budget for setup and typical operations; uncertainty remains high around activation scale (urban mass-activation) and the required size of contingent reserves, which widens the plausible cost range.