SCP-3905
Euclid
~
medium confidence
SCP-3905
Expected annual
$2.8M
One-time setup
$3.6M
Annual recurring
$2.7M
Personnel
23
Initial capital costs are moderate-to-high (~$3.6M one-time) driven by vessel purchase/outfitting and specialized sensing/ROV gear; annual operating costs are significant (~$2.69M/yr) driven by staff wages, vessel operations, and recurring monitoring/contingency contracts.
One-Time Capital Costs
Total: $3.6M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal operational year using purchased vessel, full-time crew, continuous monitoring and recurring contingency/insurance; no major incidents.
routine operations
scheduled maintenance
regular research rotations
🚨
Minor Incident
$2.9M/yr
Localized incident requiring emergency mobilization: short-notice response, limited repairs, increased legal/PR activity and small diplomatic payments.
vandalism or sensor tampering
small barrier fluctuation
local regulatory inspection requiring payouts
🚨
Major Breach
$5.2M/yr
Significant containment escalation: barrier changes or export event requiring full rapid-response mobilization, large-scale retrieval attempts and diplomatic crisis management.
barrier expansion or permeability change
SCP-3905-B mobility beyond barrier
international incident requiring heavy resources
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Six full-time covert guards (2 per shift) to provide continuous on-site presence under municipal cover. |
| Vessel Crew (Captain/Engineer/Deckhands) | 6 | [#6, #8] Crew required to operate a permanently assigned research vessel (captain, engineer, deckhands). |
| Research Scientist | 6 | [#9, #20] Rotating marine biologists/physicists and technical researchers conducting observations and experiments. |
| Data Analyst / Archivist | 3 | [#20] Analysts and archivists for image/audio analysis, data processing and report generation. |
| Project Manager / Administrative Staff | 2 | [#30, #19] HQ coordination, program management, security clearance processing and administrative/legal liaison. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a mid-confidence estimate; large uncertainties remain around vessel purchase vs charter, permissive/covert diplomatic costs, and low-probability high-impact breach scenarios which reduce confidence.