SCP-3980
Keter
~
medium confidence
SCP-3980
Expected annual
$8.6M
One-time setup
$21.9M
Annual recurring
$8.2M
Personnel
35
Estimated one-time capital costs are approximately $21,620,000 driven by entombment, high-end lab/cleanroom setup, and large excavation/space contingencies; recurring annual costs are approximately $8,250,000 driven by security staffing, Site-087 operations, and memetic research and monitoring.
One-Time Capital Costs
Total: $21.9M
Annual Recurring Costs
Total: $8.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.2M/yr
Normal operational year with no major incidents; routine containment, research, and administration.
no major breaches
steady research progress
routine maintenance
🚨
Minor Incident
$8.5M/yr
Small on-site incident or equipment failure requiring limited remediation, temporary increased monitoring, and targeted amnestic campaigns.
false alarm/tamper event
localized contamination or sensor failure
small-scale investigative operation
🚨
Major Excavation
$19.2M/yr
Containment failure or research decision forces a full-scale (covert) excavation/retrieval requiring large one-time expenditures and elevated operational tempo.
entombment breach
need for physical sample recovery
large-scale forensic excavation
🚨
Political Exposure
$11.2M/yr
Significant public exposure or legal action requiring payouts, heavy legal/PR effort, and expanded covers.
leaked incident details
local lawsuits or FOIA breach
media/political scrutiny
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#5] 24/7 armed perimeter force across three shifts; headcount chosen within analyst range (12–24). |
| Research Scientist | 6 | [#27, #16] Memetic and anomalous research team (4–8 researchers recommended), included in research_and_monitoring staffing. |
| Interviewer / Forensic Specialist | 3 | [#13] Forensic interviewers and analysts to handle impaired witnesses, transcription and secure evidence handling. |
| Radio/Signal Analyst | 2 | [#7] Signal intelligence analysts monitoring transmissions from FOB Locke and surrounding bands. |
| Medical Officer | 3 | [#11] Medical and psychiatric staff providing ongoing care and neuroimaging support for detainees. |
| Site Director / Executive Staff | 1 | [#9, #30] Senior oversight and covert program management for Site-087 and FOB Locke operations. |
| Engineer / Maintenance | 2 | [#28, #6] Technical staff for generators, HVAC/filtration, sensors and routine facility maintenance. |
| Administrative Staff | 2 | [#30] Covert accounting, logistics coordinators and program administrators for off-books operations. |
Confidence Notes
Estimates are drawn directly from analyst ranges but many items (entombment volume, lab instrument purchase vs access, and excavation/space contingencies) have large uncertainties; recurring staffing and research budgets are better constrained than long-tail one-time contingencies.