SCP-4013
Pending
?
low confidence
SCP-4013
Expected annual
$19.7M
One-time setup
$109.2M
Annual recurring
$18.5M
Personnel
65
One-time establishment costs are dominated by construction of a specialized temporal-nullification chamber, bespoke equipment and a large contingency reserve (~$109.3M total one-time). Recurring annual costs are driven by MTF and research salaries, equipment maintenance and transfer/logistics (~$18.5M/yr).
One-Time Capital Costs
Total: $109.2M
Annual Recurring Costs
Total: $18.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$18.5M/yr
Normal operational year with no major incidents; steady transfers during transition and routine maintenance.
planned_transfers
routine_maintenance
scheduled_training
🚨
Minor Incident
$20.5M/yr
Localized temporal instability or equipment failure requiring MTF mobilization, short-term repairs and increased medical monitoring.
equipment_failure
localized temporal disturbance
minor personnel exposure
🚨
Major Breach
$68.5M/yr
Major containment failure or site-level catastrophe requiring large-scale emergency response, use of contingency reserve, rebuilding and mass-care.
power_system_catastrophe
cascade temporal destabilization
site destruction
Personnel
65 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 48 | [#6] Four named Foresight teams (~10–12 operators each) responsible for ongoing escort and interim security. |
| Research Scientist | 6 | [#14] Senior scientists and postdocs assigned to SCP-4013 research; salaries included in staff_wages. |
| Engineer / Maintenance | 3 | [#11, #12] Engineers for field generators, HVAC, sensors and on-call facility maintenance. |
| Lab Technician | 3 | [#15] Laboratory technicians supporting experiments, data capture and apparatus upkeep. |
| Medical Officer | 2 | [#16] Medical and psychiatric staff for screening and ongoing care; costs included under medical_and_longterm_care. |
| Administrative Staff | 3 | [#19, #25] Administrative, legal and cover-story support personnel for procurement, documentation and personnel rotations. |
Confidence Notes
Costs are low-confidence due to high uncertainty inherent in temporal anomalies, broad ranges in R&D/hardware needs, unknowns about required redundancy and personnel medical burden; many line items are order-of-magnitude estimates.