SCP-4059
Unknown
~
medium confidence
SCP-4059
Expected annual
$2.4M
One-time setup
$3.7M
Annual recurring
$2.3M
Personnel
15
Initial setup is capital-intensive (~$3.68M) driven by land/site acquisition, construction of a staffed cover-site and a reinforced Type-C cell, plus equipment; annual operations are ~ $2.33M driven by security and scientific staffing, MTF contingency, and research/monitoring.
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $2.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.3M/yr
Normal uneventful year with standard operations, maintenance, research, and one MTF deployment reserve retained but unused.
no breaches
routine maintenance and research
monthly water transfers and scheduled feedings
🚨
Minor Incident
$2.6M/yr
Localized containment/cover incident requiring MTF mobilization, extra amnestics/legal response, short repairs and public-facing PR mitigation.
isolated escape or sighting
civilian encounter requiring amnestic response
small infrastructure repair
🚨
Major Breach
$3.5M/yr
Significant multi-instance escape or public exposure forcing large-scale MTF operations, reconstruction of containment, large legal/PR and possible federal investigation response.
multiple SCP-4059-2 instances active
public mass-casualty sighting or mass grave discovery
prolonged multi-day MTF operation
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 6 | [#7] Rotating on-site guards responsible for 24/7 perimeter control under the NJDEP cover. |
| Security Supervisor | 2 | [#7] Supervisors/management for the security team and cover-site operations. |
| Research Scientist | 3 | [#8] Behavioral/archaeological/pathology scientists (3x salaried positions included in recurring research staff costs). |
| Lab Technician | 3 | [#8] On-site technicians supporting lab work, sample processing, and routine monitoring. |
| Veterinarian / Medical Officer | 1 | [#8] On-site vet/medical liaison for animal care, veterinary oversight of feedings and medical emergencies. |
Confidence Notes
Many line items are well-specified (construction, staffing, per-unit costs) but several figures use ranges and per-instance contingencies; breach probabilities and large-event costs are inherently uncertain, yielding medium confidence.